![Badger Meter LM OG-TAER Instructions For Use And Maintenance Manual Download Page 13](http://html1.mh-extra.com/html/badger-meter/lm-og-taer/lm-og-taer_instructions-for-use-and-maintenance-manual_3627645013.webp)
11
R 1K2
1K2
R
AUSG.1
OUT 1
OUT 2
AUSG.2
0V
GND
6-24 VDC
SUPPLY
OG-TAER 200
GRÜN
GREEN
WHITE
WEISS
BROWN
BRAUN
YELLOW
GELB
5. Changing the battery
If you change the battery, please proceed as follows:
6. Wiring diagram LM OG-TAE(R) 2 x 100
LM OG-TAE(R) 2 x 100
102128, 102130, 102131, 103132
The wiring configuration is different for the meters
102128
and
102130
to:
channel 1 = white; channel 2 = green
Wiring diagram
LM OG-T 100 / LM OG-HFT 1“ / LM OG-HFT 66,75 PPL
LM OG-T 2 x 100
102101 / 102920 / 102915
102106
Wiring diagram
Wiring diagram
Reedswitch
yellow
white
brown
green
Picture 1: Loosen the battery
cover
Picture 2: Take out the battery
Picture 3: Insert the new battery and
press the reset button to check the
function of the register
Picture 4: Insert the battery
cover, then screw the battery
cover tight
Reedswitch
white
brown