26
Flush
Flush
Flush
Flush
PARTS REQUIRED
FRONT WALL INSTALLATION
BEGIN
1
Secure lower edge of panels to floor frame
with 2" nails spaced 6" apart.
Angle nails into floor framing.
2
Center front wall on the floor.
Secure bottom of front wall panels to
side wall studs with (2) 2" screws.
2" (5,1 cm)
x2
2"
(5,1 cm)
Screw
2"
(5,1 cm)
Screw
2" (5,1 cm)
x10
2"
(5,1 cm)
Nails
2"
(5,1 cm)
Nails
6"
(15,2 cm)