29
Install (2) upper side wall panels flush along front and back wall corner panels.
Secure panel to vertical framing with 2" nails spaced 6" apart.
Secure panel to side wall framing with 1-1/2" nails spaced 6" apart.
BEGIN
1
UPPER SIDE WALL PANELS
PARTS REQUIRED:
2" (5,1 cm)
x18
1-1/2" (3,8 cm)
x26
x1
x1
Flush
Flush
Flush
Flush
Flush panel corners.
Install wall panels with the primed side facing out.
2"
(5,1 cm)
Nails
2"
(5,1 cm)
Nails
6"
(15,2 cm)
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
Your upper side wall panels are now installed.
FINISH