20
PARTS REQUIRED
2" (5,1 cm)
x13
LEFT WALL INSTALLATION
2"
(5,1 cm)
Nails
2"
(5,1 cm)
Screws
Secure lower edge of wall panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame.
2
Center left wall on the 72" side of floor.
Secure wall panel to floor frame with (2) 2" screws.
BEGIN
1
2" (5,1 cm)
x2
DOOR
6"
(15,2 cm)