x16
1-1/2" (3,8 cm)
x2
2 x 4 x 6-1/2" (5,1 x 10,2 x 18,4 cm)
UY
TEMPORARY SUPPORT
x2
2 x 3 x 61-3/4" (5,1 x 7,6 x 156,8 cm)
CMA
x2
2 x 4 x 4" (5,1 x 10,2 x 10,2 cm)
CQA
40
GABLE PANELS
PARTS REQUIRED:
x2
x2
Primed
side up
Primed
side up
Flush
1-3/4"
(4,5 cm)
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
Nails
CQA (on flat)
CMA
UY (on flat)
CMA
Orient parts on flat as shown.
You will build
TWO
assemblies. Place LEFT front gable panel as shown and secure using
1-1/2" nails as shown.
2
1
BEGIN
3
4
Place RIGHT front gable panel flush to left panel. Secure using 1-1/2" nails as shown.
Repeat Steps 1-3 to build second gable panel.
You have finished assembling your gable panels.
FINISH
5
Flush