66
PARTS REQUIRED:
LOFT
Locate TP
loft joists flush to bottom of top plate and secure with 3" (7,6 cm) nails at wall studs, as shown.
1
BEGIN
BACK
WALL
Corner
Stud
PARTS REMOVED
FOR CLARITY
3" (7,6 cm)
Nails
TP
x3
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x19
3" (7,6 cm)
x34
2" (5,1 cm)
x2
48" x 44-1/4" (112,4 x 104 cm)
Flush
Attention:
Load not to exceed
400 lbs (181 kg) evenly
distributed across loft.
2
FINISH
3
You have finished installing your Loft.
Install loft panels centered over loft joists. Secure with 2" (5,1 cm) nails 8" (20,3 cm) apart.
8"
(20,3cm)
2" (5,1 cm)
Nails
Flush
Flush