TECHO
Install collar tie on
middle-rafter.
Flush
GUA
45
FINISH
Your collar tie is now installed.
HINT:
For best appearance, install
collar ties on back side of rafter.
x6
2" (5,1 cm)
COLLAR TIES
PARTS REQUIRED:
Install (1) collar ties
GUA
on center rafter
(Fig. A)
.
Ensure rafters are level and flush to roof panels.
BEGIN
1
Fig. A
Flush to roof
panel
2"
(5,1 cm)
Nails
x1
1 x 3 x 60" (2,5 x 7,6 x 152,4 cm)
GUA