![background image](http://html1.mh-extra.com/html/backyard-products/shedmaster-gable/shedmaster-gable_assembly-manual_3357550037.webp)
2 x 4 x 53-11/16" (5,1 x 10,2 x 136,4 cm)
x4
CL
1-1/4" (3,2 cm)
GABLE TRIM
PARTS REQUIRED:
x40
35
Flush
Center on
gable panels.
CL
CL
CL
1-1/4" (3,1 cm)
Screws
1-1/4" (3,1 cm)
Screws
Stagger Screws
Fig. A
Flush
Flush
FINISH
Position one
CL
flush to front panel edge and center on right edge of groove
(Fig. A)
.
Secure trim with (10) 1-1/4" screws from inside.
Position second
CL
flush to panel edge and flush to installed
CL
(Fig. A)
.
Secure trim with (10) 1-1/4" screws from inside.
Repeat steps to install the back trim.
Your gable trim is now installed.
2
1
BEGIN