37
TP x4
TP x4
ROOF PURLINS
PARTS REQUIRED:
BEGIN
1
Align
TP
using notches in the gable panel for position
(Fig. A)
.
FINISH
Your roof joists are now installed.
3-1/2" (8,9 cm)
x8
3" (7,6 cm)
x8
3" (7,6 cm)
Screws
3-1/2" (8,9 cm)
Screws
CENTER
Flush
Flush
x4
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
2
Secure
TP
from outside using 3" screws at back gable and using 3-1/2" screws at front gable.
Fig. A