30
3/4"
(1,9 cm)
1-1/4"
(3,2 cm)
1-1/4"
(3,2 cm)
x1
x1
x8
1-1/2" (3,8 cm)
FRONT WALL GABLE
PARTS REQUIRED:
Primed
side up
Orient parts
SFA
on fl at as shown.
Place LEFT front gable panel as shown. Secure using 1-1/2" nails as shown
2
1
BEGIN
3
Place RIGHT front gable panel fl ush to left panel. Secure using 1-1/2" nails.
You have fi nished assembling your front wall gable.
FINISH
SFA
SFA
x2
2 x 3 x 4-7/8" (5,1 x 7,6 x 12,4 cm)
SFA
Flush
Flush
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
Nails
Flush