background image

16572-A

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

f

 owc

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request
Answers to frequently asked questions
Live chat with an agent

Summary of Contents for 16572-A

Page 1: ...AM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based...

Page 2: ...This page intentionally left blank...

Page 3: ...Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and material...

Page 4: ...r installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best sur...

Page 5: ...REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general use Depending on your specific use you may want to construct a heavy duty floor frame by adding additio...

Page 6: ...82 8 cm x1 1 x 3 x 5 2 5 x 7 6 x 12 7 cm TRIM x2 19 32 x 3 1 2 x 48 1 5 x 8 8 x 121 9 cm x1 19 32 x 3 1 2 x 52 3 8 1 5 x 8 8 x 133 cm x2 2 x 3 x 33 1 8 5 1 x 7 6 x 84 1 cm x1 x4 19 32 x 2 1 2 x 9 1 5...

Page 7: ...9 x 5 1 x 174 6 cm x1 3 8 x 2 x 69 1 4 0 9 x 5 1 x 175 8 cm x1 3 8 x 2 x 69 1 4 0 9 x 5 1 x 175 8 cm x2 3 8 x 2 x 91 1 4 0 9 x 5 1 x 231 7 cm x1 3 8 x 2 x 93 1 4 0 9 x 5 1 x 236 8 cm x1 3 8 x 2 x 93...

Page 8: ...x 96 1 x 121 9x 243 8 cm x1 3 8 x 42 x 83 1 8 1 x 106 6x 211 1 cm x1 3 8 x 23 7 8 x 72 1 x 60 6 x 182 9 cm x1 3 8 x 48 x 96 1 x 121 9x 243 8 cm x1 3 8 x 48 x 96 1 x 121 9x 243 8 cm 8 2 5 1 cm 3 7 6 c...

Page 9: ...ng in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 10 10 x 1...

Page 10: ...ill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to...

Page 11: ...er nailing stand on frame 2 1 Secure with 2 3 nails at each mark Arrange parts as shown on flat surface Measure and mark BEGIN You have finished your floor frame Proceed to level and square frame FINI...

Page 12: ...re The diagonal measurement will be approximately 150 381 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposi...

Page 13: ...floor frame is square by installing one panel and squaring frame Fig A Fig B Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floo...

Page 14: ...ntinue installing panels with rough side up painted grid lines Use grid lines on panel during installation Secure with 2 nails spaced 6 apart on edges and 12 apart inside panels 5 x1 x1 x91 5 8 x 23 7...

Page 15: ...rame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build...

Page 16: ...3 8 cm 1 1 2 3 8 cm 48 121 9 cm HINT For easier nailing stand on frame x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x6 2 x 4 x 64 5 1 x 10 2 x 162 5 cm UX x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x28 16 3 7...

Page 17: ...el onto wall frame flush to top of frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with 2 2 nails in the corners Fig A Ensure your wall frame is square by...

Page 18: ...to installed panel Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 4 Install 23 7 8 x 72 panel on frame flush to installed panel Secure with 2 nails spaced 6 apart on edges and 1...

Page 19: ...2 x 71 2 cm x2 RR 2 x 4 x 16 1 2 5 1 x 10 2 x 42 cm x1 RD x34 3 7 6 cm D O O R BEGIN 1 Secure with 2 3 nails at each mark and 4 3 nails at seam Arrange parts on edge on floor Measure and mark Flush F...

Page 20: ...REQUIRED HINT For easier nailing stand on frame 2 x 4 x 16 5 1 x 10 2 x 42 cm x3 RD x12 3 7 6 cm Secure with 2 3 nails at each mark Install parts RD on edge as shown Measure and mark 2 27 1 2 69 9 cm...

Page 21: ...5 1 2 Secure panel with 2 2 nails spaced 6 apart Maintain 64 162 5 cm measurement between studs and square frame 2 1 MAINTAIN 64 DIMENSION BETWEEN STUDS Hold the 3 4 measurement along left edge of pan...

Page 22: ...el flush to left panel Secure panel with 2 2 nails spaced 6 apart Maintain 64 162 5 cm measurement between studs and square frame 4 3 Install OO as a brace to maintain 64 162 6 cm opening Secure with...

Page 23: ...5 1 2 14 cm MAINTAIN 64 DIMENSION BETWEEN STUDS Repeat step 5 to install the right panel Install 11 7 8 x 96 panel onto wall frame flush to installed panel Ensure top of panel is overhanging the top o...

Page 24: ...loor frame Fig A 2 Your back wall is now standing FINISH Secure side wall bottom plate to floor with 3 nails Fig A 3 3 7 6 cm x10 x22 BACK WALL INSTALLATION D O O R 3 Nails into bottom plate BEGIN Cen...

Page 25: ...SH Secure front wall bottom plates to floor with 3 nails Fig A 4 x8 x4 x10 FRONT WALL INSTALLATION D O O R 3 7 6 cm Screws x4 BOA x2 3 nails into bottom plate BEGIN Center front wall assembly on the 1...

Page 26: ...P 3 7 6 cm Nails Stagger seams 3 7 6 cm Nails Flush Flush Flush Flush Flush Flush BMA BNA Stagger seams WALL DOUBLERS BEGIN 1 2 Your doublers are now installed Secure with 2 3 nails at each stud and 4...

Page 27: ...rew installed centered into outer rafter end Fig A Secure rafter with another 3 screw angled into inside of rafter Fig B Secure front of outer rafter with 1 3 screw installed centered into outer rafte...

Page 28: ...driven in at an angle Fig B Fig D Repeat steps 2 through 5 to install 6 remaining rafters Line up rafter centered with marks on front doubler Ensure rafter is flush to front wall panel Fig C and rest...

Page 29: ...e rafter extension above top of front wall panels Fig B Use another rafter extension BRA as a guide to line up rafter extension with top of main rafter Fig A Repeat steps to install remaining 8 rafter...

Page 30: ...nto floor frame Fig C Place 42 x 83 panel onto side wall flush with bottom of 48 x 96 panel as shown Secure panel with 2 nails in three corners Fig E Ensure the measurement between the panel edges are...

Page 31: ...cm 6 15 2 cm 6 15 2 cm x45 1 1 2 3 2 cm 5 Secure lower edge of panel to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure side wall panels to rafter and wall studs with 1 1 2...

Page 32: ...am of wall panels BKA BJA BFA 3 7 6 cm Screw D O O R MARK BEGIN Install BJA centered at seam of side wall panels Fig A Use a square to ensure 90 degree squareness of studs BKA BFA and BJA Mark locatio...

Page 33: ...all panels are now secured FINISH Secure side wall panels to inside wall studs with 1 1 2 nails spaced 6 apart along panel seam and 12 apart in middle of panels as shown Measure align and mark side wa...

Page 34: ...You must square the roof by attaching one panel first You will use the panels long edge as a lever to bring your roof into square Commonly known as racking Roof panels may cause serious injury until s...

Page 35: ...sh Flush Fig E DOOR DOOR Secure the first 48 x 96 roof panel with 2 nails spaced 6 apart on edge and 12 apart inside panel Install the second 48 x 96 roof panel flush to first panel along edge and at...

Page 36: ...ne up each rafter extension 90 degrees square with roof rafters as shown Secure rafter extensions with screws through roof panels Fig A Use 4 screws at roof panel seams Fig B 7 D O O R FINISH Fig B Fi...

Page 37: ...e flush with BRA Fig A Secure with 3 2 finishing nails Fig B BEGIN HJ BPA BRA 2 Install HJ flush with BPA Secure with 5 2 finishing nails Fig A Fig B Repeat Steps 1 2 on opposite side Your gable rake...

Page 38: ...UA approximately 1 4 beyond roof panel Fig B Secure BUA with 2 finishing nails Fig C BEGIN 1 Attach BTA to BRA Fig A Fig C flush with BUA Secure with 2 finishing nails BTA extends approximately 1 4 be...

Page 39: ...PARTS REQUIRED x28 2 5 1 cm x2 19 32 x 3 1 2 x 48 1 5 x 8 8 x 121 9 cm x2 2 x 3 x 33 1 8 5 1 x 7 6 x 84 1 cm BQA x2 ZT x1 x1 19 32 x 3 1 2 x 59 1 4 1 5 x 8 8 x 150 4 cm 19 32 x 3 1 2 x 59 1 4 1 5 x 8...

Page 40: ...1 4 space as shown Fig C Repeat steps on opposite side 3 Secure front fascia to side fascia with 2 2 finished nails Fig D 5 1 4 13 3 cm Fig C 2 Screws Install side fascia assembly underneath roof pan...

Page 41: ...or ZX 2 Nails ZT Install PT and FS flush to roof sheathing and to ZT Fig B Fig C BEGIN 1 Secure PT and FS with 2 screws through roof sheathing and with 1 3 screw at OY on both ends Fig B Fig C 2 PT FS...

Page 42: ...board under BRA Secure with 6 2 finishing nails Fig A B Align 95 3 8 soffit board flush with 35 3 4 Secure soffit board with 14 2 finished nails underneath BRA Fig D Fig A 35 3 4 90 8 cm 95 3 8 242 2...

Page 43: ...5 1 cm SOFFIT continued Install 95 1 2 soffit board under fascia backer and side rake framing Fig C D Secure with 14 2 nails Repeat Step 3 on the opposite side 3 Your soffit panels are now installed...

Page 44: ...175 3 cm x2 x4 BEGIN 1 Arrange parts as shown on flat surface 3 8 offset is to top Look for red right and green left on hinge board 2 3 Secure temporary support OO with 3 screws in middle and at ends...

Page 45: ...ISH Your doors are now installed Install temporary support OO flush under wall panels Secure with 3 screws Fig A Screw hinge boards into wall frame and floor with 10 3 screws as shown Make sure screws...

Page 46: ...m AH DOOR RAILS OPTION 1 PARTS REQUIRED 3 4 1 9 cm x44 CENTER AH x4 AH x4 11 3 8 28 9 cm 11 3 8 28 9 cm CENTER CENTER Fig B AH EHT BEGIN 1 Secure 2 horizontal door rails AH at measurements shown Use E...

Page 47: ...ENTER AH x4 AH x4 AH x4 11 3 8 28 9 cm 11 3 8 28 9 cm CENTER CENTER Fig B EHT BEGIN 1 Secure 4 horizontal door rails AH at measurements shown Use EHT as a spacer Install bottom rail first Secure door...

Page 48: ...ugh outside trim into OO Fig B 1 PARTS REQUIRED 69 Door Stiffener 175 3 cm x2 x10 2 5 1 cm DOOR WEATHERSTRIPPING OO FINISH On the right door center OO vertically in door opening Fig A OO will offset t...

Page 49: ...om frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR PARTS REQUIRED DOOR HARDWARE x2 x8 5 16 0 8 cm Drill Bit Yo...

Page 50: ...5 3 4 90 cm RIGHT DOOR 1 1 2 3 8 cm TOP VIEW 1 4 Pre drill and 1 2 Drill through DOOR HARDWARE x1 x2 PARTS REQUIRED 1 1 2 3 8 cm Re drill hole with 1 2 drill Keep drilled hole square to trim to avoid...

Page 51: ...evel Secure with 2 screws at top of windows Do not fully tighten screws 2 HINT Caulk behind frame near edge before installing Approximately 1 2 5 cm 2 Screws per window You must caulk around windows t...

Page 52: ...inishing nails as shown Install EY at ends and in between window frame as shown Secure with 8 2 finishing nails Remove the 1 1 4 screws Install BSA centered on window frame as shown Secure with 4 2 fi...

Page 53: ...paintable exterior rated caulk 53 PARTS REQUIRED WINDOWS x12 3 4 1 9 cm 6 Your windows are now installed FINISH Working inside secure trim with 12 3 4 screws as shown Do not screw into window flange I...

Page 54: ...r side 2 FINISH Fig C 68 3 4 174 6 cm 69 1 4 175 8 cm Angled End up Install 69 1 4 back side corner trim angled end up Fig E flush up under side soffit panel and flush with back corner trim along the...

Page 55: ...RED x12 BEGIN 1 Install 25 3 8 and 96 front horizontal frieze boards Leave 3 8 9 5 mm overhang on both ends Fig B Secure with 2 finishing nails as shown Fig A FRONT FRIEZE TRIM FINISH Your front friez...

Page 56: ...R TRIM Install both vertical 91 1 4 front corner trim on both sides flush to bottom edge of previously installed horizontal frieze trim Secure with 6 2 finishing nails per trim Figures A B C FINISH Yo...

Page 57: ...th the primed side facing out PARTS REQUIRED x12 2 5 1 cm FRONT SIDE TRIM FINISH Your front side trim boards are now installed Install 93 1 4 front side corner trims on both sides flush with front fri...

Page 58: ...s shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws Your vents are now installed x12 1 2 1 3 cm x2 VENTS 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 1...

Page 59: ...ovided by manufacturer Follow directions provided by manufacturer You must install drip edge to validate warranty PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt fl...

Page 60: ...nstall first starter row upside down color up and flush to drip edge at bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof d...

Page 61: ...shed make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at front roof edge cut to roof edge with a utility knife 1 2 5 cm 5 12 7 cm 5 12 7 cm or less BACK OF...

Page 62: ...w with 1 overhang over roof edge Align remaining shingles with edge of the front drip edge Using your shingle hooked blade carefully cut shingles on a flat surface along the rain slots using a chalk l...

Page 63: ...lls Short Panel Left NG METROPOLITAN LFT SIDEWALL K 83024200200 1 Front Wall Panel 3 8 NG 11 7 8 X 96 FRONT K 96001114000 2 Side Soffit Panels 3 8 NG 5 1 4 X 95 1 2 SOF K 95080504000 2 Front Wall Soff...

Page 64: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...

Reviews: