ITEMS FOR PHASE 30
DESCRIPTION
QTY
BAY WINDOW ASSEMBLY
1
SCREW PFH 8x2-1/2
8
Fort Assembly
Phase 30
Phase Notes
• Most of the fort is not shown in this view for clarity.
• Center one bay window assembly in the opening made by B6, B4, G4, and H2.
• Using the holes in G5 as a guide, pre-drill into the edges of G4 and H2, using a 1/8" drill bit.
To help hold the bay window in place, it would be best to pre-drill just two places in the top
and bottom and secure the window assembly with four screws. Then pre-drill the remaining
holes and finish attaching with screws as shown.
• Attach the other bay window assembly on the opposite side of the fort.
B6
B4
G4
H2
G5
G5
SCREW PFH 8x2-1/2
BAY WINDOW ASSEMBLY