Series 3000 Cooling Towers should be rigged and
assembled as outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the
actual rigging and assembly of the equipment to acquaint all
personnel with procedures to be followed and to assure that all
necessary equipment will be available beforehand.
Be sure to have a copy of the certified drawing available for reference. If
you do not have a copy of this drawing, or if you need additional information
about this unit, contact your local BAC Representative whose name and
telephone number are on a label adjacent to the access door. The model
number and serial number of the unit are also located in this area.