40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
RELEASE DATE
01/27/2021
REFERENCE NUMBER
INS-2832-00
Installation Instructions
5. Ensure fixture leads are inside junction box.
Mount fixture canopy to junction box over
mounting plate using three (3) #8-32 set
screws with 9/64” Allen wrench.
4. Circled locations are mounting holes for
mounting heavy duty mounting plate to
substrate. Use mounting hardware (By Others)
suitable for substrate material.
Seal building
envelope as per NEC.
DENALI SERIES
INTEGRAL DRIVER - TWIN SIGN STAR
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION
INSTRUCTIONS
Safety Cable Installation Instructions - If Required
8. Tighten set screw when cable notch in stem is
in line with support cable and support canopy.
7. Adjust stem so that cable notch in stem lines
up with support canopy location and cable.
Loosen 3/8” set screw in stem to adjust.
6. Mount support canopy above fixture location
using appropriate mounting hardware for surface.
(by others).
Seal building envelope as per NEC.
Do not overtighten.
Depending on fixture stem length, fixture will not support itself. Structural support cable
must
be installed in the field. Please read support canopy and safety cable installation.
ST-DE-A
Stem greater than 36” inches
ST-DE-B
Stem greater than 36” inches
ST-DE-C
Stem greater than 36” inches
ST-DE-F
Stem greater than 36” inches
ST-DE-G
Stem greater than 36” inches
For fixtures with stem length greater than 36”, fixture will not support itself. Structural support
cable
must
be installed in the field. Please read page 3 for support canopy and safety cable
installation.