background image

RELEASE DATE

12-19-2019

REFERENCE

 

NUMBER

INS-2816-00

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

1.  Place composite housing in hole. Align 

flexible conduit through 1” notch in bottom 

of composite housing. Pull conduit to splice 

location.

Installation

PROJECT:

TYPE:

AGI2 LED

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

Soil Prep

Conduit
Trench

Excavated 
for Housing

C.  Prep soil according to DIG-IT Guide.

Conduit
trench

18”

Dia.

A.  Determine Soil Type by referencing DIG-IT 

Guide. 

B.  Dig hole 18” wide and deep enough for 

faceplate height above grade as per lighting 

plan.

2.   Make watertight connections using provided 

waterproof wire nuts.  

See wiring diagram.

Hydrolock

Plate

LINE

COM

GROUND

DIM +

DIM -

WIRING DIAGRAM

3.   For soil installation, fill and tamp soil to the 

appropriate height. Fixture is above grade 

specified by lighting plan.

Aiming Adjustment

1.  Remove faceplate using 1/8” Allen wrench.

2.  To aim OptiLock® horizontally: lift OptiLock® 

from resting position, and rotate to desired 

angle. Set down on pins provided in housing. 

OptiLock® is gravity held in place. 

3.  To aim OptiLock® vertically: loosen two (2) 

1/4-20 screws using 3/16” Allen wrench. Tilt 

swivel arm with LED and optic in desired aiming 

direction. Tighten two (2) 1/4-20 screws with 

3/16” Allen wrench to secure position.

The below grade portion 

of the housing to be 18”

Summary of Contents for AGI2

Page 1: ...al Code and all Local and Provincial Codes Follow product label information and instructions Qualified Personnel with appropriate personal protective equipment must perform all servicing of this product Before wiring to power supply and during servicing turn off and lock out power at fuse or circuit breaker before service The use of accessory equipment not recommended by the manufacturer or instal...

Page 2: ...e 18 wide and deep enough for faceplate height above grade as per lighting plan 2 Make watertight connections using provided waterproof wire nuts See wiring diagram Hydrolock Plate LINE COM GROUND DIM DIM WIRING DIAGRAM 3 For soil installation fill and tamp soil to the appropriate height Fixture is above grade specified by lighting plan Aiming Adjustment 1 Remove faceplate using 1 8 Allen wrench 2...

Page 3: ...f accessory lens if used faces LED 5 Install faceplate using 1 8 Allen wrench and hand tighten the faceplate screws in a star pattern to 30 lbs min Do not use a power tool to install screws Do not exceed 40 lbs 4 Remove any dirt or debris in O ring groove near top of housing Place O Ring inside of groove Failure to clean groove of debris will cause fixture to fail and void product warranty 6 Insta...

Page 4: ...in housing OptiLock is gravity held in place 8 To aim OptiLock vertically loosen two 2 1 4 20 screws using 3 16 Allen wrench Tilt swivel arm with LED and optic in desired aiming direction Tighten two 2 1 4 20 screws with 3 16 Allen wrench to secure position 2 Turn then lift OptiLock from housing Disconnect OptiLock assembly from driver assembly using quick disconnect 3 Remove optic by turning to t...

Page 5: ...n lift OptiLock from housing Disconnect OptiLock assembly from driver assembly using quick disconnect 9 Attach OptiLock assembly to installed driver assembly with quick disconnect Place OptiLock assembly in housing resting the OptiLock on the pins provided inside the housing Gravity will hold OptiLock in place 3 Remove optic by turning to the left to unlock optic from optic holder tabs and lift up...

Reviews: