Fixing to the floor
(Fig. 4.6)
a) Remove the four plastic caps
(5)
;
b) make holes in the floor at point
(1-2-3-4)
, drilling through the holes in the machine base;
c) insert steel anchors and tighten;
d) put back the plastic caps
(5)
.
27
Packaging Equipment
Fig. 4.6