Azbil NX-SVG Installation Manual Download Page 8

E2

UNPACKING

The following items should be included in your purchase.

• 

NX-SVG 1

• 

Installation Manual (this manual) 

CP-UM-5928JE

OVERVIEW

Linked by Ethernet, Network Instrumentation Module provide dis-

tributed instrumentation and high-speed communication with less 

wiring and less engineering work. The modules also create value for 

customers by offering reduced environmental impact, superior qual-

ity, and higher productivity. The NX-SVG Smart Device Gateway 

transfers data between a host device such as a PLC and slave devices 

such as Network Instrumentation Modules.

MODEL SELECTION TABLE

Basic 

Model No.

Type

Ring 

connection

Option

Addition

1 2 3 4

NX-

Network 

Instrumentation Module

SVG

Smart Device Gateway

N

Non-ring 

communications

R

Ring communications

0

With USB connector

1

Without USB connector

0

None

0

None

0

None

0

None

K

Anti-sulfide treatment

NAMES OF PARTS

 

„

Main unit

PWR

NX-SVGN

USB

DA(+)

SG

DB(−)

RS-485 CH1

RS-485
BATTERY
LINK/ACT

LAN1

FUNCTION

ERROR

ID

F1

F2

RUN MOD COM NST FAIL

 

*Only if “0” was selected in option 1.

 

„

Base

ID switch

Set the device ID using 
this switch.

Function selection switch

Specify the number of the 
function to execute.

USB host connector*
Function indicators

LAN1 connector

Operation indicators

Function execution switch

Press the button with a 
sharp-tipped object to 
execute the set function. 
Use the function selection 
switch to specify which 
function to execute.

RS-485 CH1 connector

DA (+)
DB (−)
SG

Side connector

LAN2 connector for 
coupling modules.
Connects the power, 
LAN, and RS-485 of 
adjacent modules.
Does not connect RS-485 
CH2 terminals.

Power supply terminal:

1: 24 V DC (+)
2: 24 V DC (−)

RS-485 CH2 terminals

4: DA (+)
5: DB (−)
6: SG
These terminals cannot 
be connected with the 
side connector.

 

„

Indicators

 

z

Operation indicators

LED name

Color LED state

Operation state

PWR

Green

Lit

Power is on

Off

Power is off

RUN

Green

Lit

System is operating

Off

System is not operating

MOD

Orange

Lit

Program is running 

Off

System error

Blinking Initializing/checking connected device 

operation/stopped

COM

Green

Lit

LAN2: Ethernet packets for the module 

are being received

Off

LAN2: Ethernet packets for the module 

are not being received

NST

Orange

Lit

LAN2: Non-ring communication by 

chain-connected devices

Fast 

blinking

LAN2: Chain connection ring is 

disconnected (a disconnection 

somewhere in the ring)

Slow 

blinking

LAN2: Chain connection ring is 

disconnected (no ring communication 

with local or adjacent node)

Off

LAN2: Ring communication by chain-

connected devices

FAIL

Red

Lit

Hard failure

Fast 

blinking

Soft failure (base-main unit model No. 

mismatch, setting error)

Off

No errors

 

z

Function indicators

LED name

Color LED state

Operation state

FUNCTION Green

Blinking The set function is being executed.

Off

The set function is not being executed.

ERROR

Red

Lit

Communication error

Blinking An error occurred during execution of 

the set function.

Off

No errors

RS-485

Orange Blinking Data is being transferred via RS-485 

CH1 or CH2.

Off

Data is not being transferred via RS-485 

CH1 or CH2.

BATTERY

Red

Lit

No battery or low battery

Off

Battery voltage is normal

LINK/ACT Orange

Lit

LAN1 is connected

Blinking Data is being transferred via LAN1

Off

LAN1 is not connected

Summary of Contents for NX-SVG

Page 1: ...J1 CP UM 5928JE NX NX SVG URL https www azbil com jp product factory order html DIN 2 NX SVG NX SVG 1 CP UM 5928JE...

Page 2: ...ROR ID F1 F2 RUN MOD COM NST FAIL 1 0 ID USB LAN1 RS 485 CH1 DA DB SG LAN2 LAN RS 485 RS 485 CH2 1 DC24 V 2 DC24 V RS 485 CH2 4 DA 5 DB 6 SG LED PWR ON OFF RUN MOD COM LAN2 LAN2 NST LAN2 LAN2 LAN2 LAN...

Page 3: ...J3 15 m 30 Vrms 42 4 V DC60 V LAN RS 485 RS 485 CH2 DIN DIN DIN DIN DIN DIN 2 mm...

Page 4: ...uit 1 25 mm2 16AWG 30 m M3 5 8 mm 0 6 N m 1 70 W LAN1 LAN2 LAN1 RJ 45 LAN2 RS 485 CH1 RS 485 CH2 RS 485 CH1 DA SG DB RS 485 CH1 RS 485 CH2 1 2 4 5 6 DA DB SG 150 5 1 2 W SG USB USB USB USB 1 LED USB R...

Page 5: ...V 0 3 2 m s2 10 150 Hz XYZ 2h 0 9 8 m s2 3 0 3 mg m3 2000 m Pollution degree 2 20 70 5 95 RH 0 9 8 m s2 10 150 Hz XYZ 2h 0 300 m s2 DIN 3 60 cm 1 3 6 DC500 V 20 M I O AC500 V 1 min I O 6 W 10 A 30 s...

Page 6: ...il com jp 0466 20 2143 2018 2 F 2019 4 5 V LAN 2 LAN1 LAN2 IEEE802 3 10BASE T 100BASE TX AutoMDI MDI X RJ 45 100BASE TX UTP 4P Cat 5e ANSI TIA EIA 568B 100 m RS 485 2 RS 485 CH1 RS 485 CH2 1 31 RS 485...

Page 7: ...ing tab using a tool such as a screwdriver Otherwise you might be injured Do not disassemble this device Doing so might cause device failure Do not block ventilation holes Doing so might cause fire or...

Page 8: ...power LAN and RS 485 of adjacent modules Does not connect RS 485 CH2 terminals Power supply terminal 1 24 V DC 2 24 V DC RS 485 CH2 terminals 4 DA 5 DB 6 SG These terminals cannot be connected with th...

Page 9: ...S 485 CH2 terminals cannot be connected Connection of modules must be done before they are mounted on the DIN rail When connected modules share the power and communication connections eliminating the...

Page 10: ...the LAN1 and LAN2 connectors Insert an RJ 45 connector into the LAN1 connector on the de vice The side connectors on the base are LAN2 connectors Connecting to RS 485 CH1 and CH2 Connect wires to the...

Page 11: ...stance 0 m s2 Mounting angle Reference plane 3 z z Operating conditions Ambient temperature 0 to 50 C below the installed module Ambient humidity 10 to 90 RH without condensation Allowable power suppl...

Page 12: ...500 m No of wires 3 Terminating resistor External 150 0 5 W min Transmission speed Selectable from 4800 9600 19200 38400 57600 and 115200 bps Data bits 7 bits 8 bits Stop bits 1 bit 2 bits Parity bit...

Page 13: ...Sie vor dem Einschalten des Ger ts unbedingt ob es sachgerecht verdrah tet wurde ACHTUNG Die folgenden Vorsichtshinweise sind zu beachten um elektrische Schl ge Feuer und andere Gefahrenzust nde zu ve...

Page 14: ...ssere osservati al fine di prevenire scosse elettri che incendi e altre condizioni pericolose Prima di rimuovere montare o cablare questo dispositivo accertarsi di disatti vare l alimentazione di ques...

Page 15: ...sor el rango y los par me tros seg n corresponda para el objetivo de control Aseg rese de que el terminal de tierra del bastidor est correctamente puesto a tierra 100 m x antes de conectar el controla...

Page 16: ...X4 MEMO...

Reviews: