
Measurement Tool
Power Panel
Template of Installation
2.6
Check before installation
Check the complete of pole installation, the material of pole and its
installation should comply related installation specification(Pole should be
vertical, and grounding should be done, the diameter is around 40
-
60mm;
Grounding is prepared already;
Check the distance between MSR2000 and Grounding point;
The cabling is mounted on wall or ceiling;
Special installation material or tools are needed or not.
2.7
Check the equipment
Check the integration of equipment list in the package;
Check the integration of antenna, feeders and installation packages;
Check the preparation of Adhesive Tape, PVC tape and strap to be enough
for installation;