MESH networks. Power availability, line access availability , permit of antenna
installation are mandatory aspects to be considered in site survey. It is
suggested to hunt more locations than actual needs that back-up sites can be
used if the availability of some sites changed. Actual measuremet is suggested
done for complex radio environment. The idea site should meet following
requirement:
minimum obstacles to the target coverage area from the antenna.
Availability of power
Availability of Line access for Gateway
Permit of antenna installation and MSR2000 mounting.
1.1.5 Detail measurement of site survey
Site survey engineer should conduct detail measurements according the plan,
the measurements and records include site location information, antenna
selection, MSR2000 mounting position etc. Site survey report is suugested to
prepared after all site survey works finished.
Eye measurement: building information, terrain information
Eye measurement is to verify there are any obstacle and reflection in wave
propagation environment and terrain informing, such as building, trees, etc.
Spectrum measurement (optional): radio environment
Spectrum measurement is to get familiar with radio environment in the target
coverage area and antennas. The interference could from Wi-Fi APs and other
systems.
Site investgation: the availabity of power, installation of antenna and
MSR2000.
2.5
Tools Preparation for Installation
Safety tape, safety cap
Insulation tool
Installation Tool