Unpacking and Assembly
5
Operating Lever
Fig 02-03-04
WARNING!! WE STRONGLY ADVISE YOU GET
THE ASSISTANCE OF ANOTHER PERSON AS
THIS MACHINE IS VERY HEAVY!
1) Locate the operating lever (B), using a Hex key
remove the Hex screw washer and spring from the rack
and pinion assembly and place close to hand, see figs
02-03-04.
Fig 01
Remove the morticer and stand from the shipping
cartons. Report any shortages or damage to Axminster
Tool Centre Customer Services Department. (03332
406406)
Please dispose of the packaging responsibly; much of
the material is biodegradable. The machine and its
accessories will arrive coated with heavy corrosion
preventative grease and greased wax paper.
These may need to be cleaned from the machine, its
components and accessories prior to it being set up
and commissioned. Use paraffin or a proprietary
degreaser to remove the barrier grease.
Read the manual thoroughly, familiarising
yourself with the correct safety, operating
and maintenance procedures before
proceeding further.
The machine and cabinet are both
supplied fully assembled so the
initial assembly work is
limited to positioning the
morticer on the cabinet
and securing using four long
hexagon head bolts, nuts
and washers, see fig 1.
Place the machine onto a
suitable surface, that will enable
you to work comfortably and
to ensure that there is adequate
room on either side for
the size of timber
you plan to use.
Once you are
happy, bolt the
morticer
assembly down.
A
C
2) Re-position the lever (B) coupling over the rack and
pinion assembly so that the lever is in the upright position
and the teeth are meshed together, see figs 05-06.
Continues Over....
Hex screw washer
Hex bolt
Spring
Hex key
Rack and Pinion assembly
IMPORTANT NOTE: THE HEAD STOCK ASSEMBLY
HAS BEEN LOWERED FOR SHIPPING AND NEEDS
TO BE RAISED TO ITS HIGHEST POSITION. TO DO
THIS INSERT THE LEVER COUPLING OVER THE
PINION ASSEMBLY UNTIL THE TEETH MESH AND
RAISE THE ASSEMBLY!