INSTRUCTION MANUAL
21
_____________________________________________________________________________________________________________________
1
2
3
4
5
6
7
8.3.2 Scale installation
1
. Balance structure
2. Screws fixing the limiter
3. Screws fixing base plates
4. Limiter
5. Base plate
6. Foundation
7. Balance leg
1.
Prepare the foundation (7) according to guidelines (section 6) and engineering technique principles.
2.
Put the balances base plates (5) freely in the foundation.
3.
Place limiters plates (4) on plates (5). Connect both plates with M8 screws (2) so they cannot move in
respect to each other, but to allow for limiters (4) manoeuvring.
4.
Unscrew screws fixing the balance upper plate.
5.
Put the balance structure (1) in the foundation, so legs (7) fit vertically in the limiters (4) holes.
6.
Place upper plate on balance structure and lightly screw in the fixing screws.
7.
Check the upper plate location in the foundation – level in relation to foundation edge and distance
from the edges (fig. 1).
8.
When needed, shift the plates (5) or put spacers beneath them, made from sheet with dimensions of
plate.
9.
If the position of upper plate is correct, carefully remove it to not move plates (5). Check if legs (7) are
straight.
10.
Carefully remove balance structure (1) from foundation to not move plates (5).
11.
Fix plates (5) with supplied screws with steel pins.
12.
Adjust possible displacements with plates (4) position, so legs are located centrally and vertically in
plates (4) holes. Tightly screw plates (5) and (4).
13.
Put balance structure (1) in place.
14.
Place the upper plate and fix it with screws, beginning from holes in the upper plate centre
.
Connecting cable must be laid freely!