2016-01-11 | © AXING AG Schweiz | Subject to change in design and type; errors and misprints reserved
15
A few steps are enough for the module to be ready for operation. The initialization is subdivided in 3
configuration phases.
Phase 1: Tuners.
LNB settings, DiSEqC settings, transponder frequency and transponder search run.
Phase 2: Program filter, program arrangement.
Multiplexing after program filtering (Remux mode)
Transponder crossing multiplexing of FTA programs (Cross-Multiplex mode)
LCN (Logical Channel Numbering)
Phase 3: Modulators.
Channel spacing, output channel, fine calibration and output level.
Modulation, code rate, guard interval, transmission mode.
Here you can
navigate to the
Initialization and
Maintenance
pages.