11
S
Y
S
TEM C
OMPONENT
S
INS
TALLA
TION
OPERA
TION
C
ONTR
OLLER
C
OMMISSIONING
MAINTENANCE
REV0303500011217
PRIMAR
Y INSPECTION
Primary Inspection
Upon arrival, the system and accessories must be visually inspected before installation. Improper handling during shipping
may cause physical or electrical problems. Immediately report or note any damages (also concealed ones) to the shipper.
Checklist
❑
If the packing crate shows signs of damage inspect the system for damage.
❑
Check the entire system for damage that could indicate mechanical or electrical problems.
❑
Check pump/motor hardware and all plumbing connections for tightness.
❑
Check all electrical and connections for tightness.
O
VER
VIEW