- 27 -
Installation
Disconnect the cable of the Liquid
Sensor from the F. SENSOR in the ma-
nagement board.
Unhook the fastening clamp of the tank.
Remove the tank in order to avoid liquid
leakage during the installations phases.
Use the supplied drilling template for positioning the plate, both on the wall and on the ceiling. Mark the holes based
on the predefined type of installation (wall/ceiling or drop ceiling).
When fastening the bracket, use anchors capable of supporting a weight of at
least 75 Kg.
Check that the pipes are inserted in the pre-set holes.
Hook the upper pivot and the lower pivot of the Foggy to the specific
plate guide by sliding it sideways.
Both when fixing to the wall and the ceiling, rotate the equipment on the
pivots in order to easily access the inside of the Foggy with the various
cables.
1
2
Once the Foggy has
been removed from the
packaging, remove the
4 M4x6 type fixing
screws and remove the
cover.
Verify that package has been
positioned in the correct direction
before opening the package.
E
N
G
Summary of Contents for FOGGY
Page 16: ...16 I T A...
Page 17: ...17 I T A...
Page 18: ...18 I T A...
Page 19: ...19 I T A...
Page 36: ...36 E N G...
Page 37: ...37 E N G...
Page 38: ...38 E N G...
Page 39: ...39 E N G...
Page 56: ...56 F R A...
Page 57: ...57 F R A...
Page 58: ...58 F R A...
Page 59: ...59 F R A...