AV-HL-FL - Heliport Flood Light
Installation & Service Manual
Latest products and information available at
www.avlite.com
15
7.2.1 Tools Required
7.2.2 Location
Refer to ICAO Annex 14 Aerodrome Design and Operations Sixth Edition for site
requirements for heliport lights.
7.2.3 Cabling Requirements
The minimum cable requirements for the installation of the AV-HL-FL Heliport Flood Light
are below:
7.2.4 Factory Configuration
AV-HL-FL-UM and AV-HL-FL-DC
•
Wired floodlight Fixture (AC or DC) with Junction Box preassembled and wired to the
light fixture. Fixture comes mounted on a frangible sleeve and mounting plate.
AV-HL-FL-PV
•
Preassembled and prewired Solar Floodlight and Solar Assembly with 2m Power and
Data cable. Fixture comes mounted on a frangible sleeve and mounting plate.
Tools Needed (not supplied)
6mm Allen Key
Hammer
20mm Gland
16 mm Gland Max. cable length
AC
Power + Data (Single Cable)
Not Supported AC + DC
Power + Data (Separate Cables)
3 x 2.50 mm
2
4 x 1.0mm
2
100m
Power only
3 x 2.50 mm
2
Not used
100m
DC (@ 12V)
Power + Data (Single Cable)
6 x 1.00mm
2
Not used
2m
Power + Data (Separate Cables)
2 x 4.00 mm
2
4 x 1.00mm
2
10m
Power only
2 x 4.00 mm
2
Not used
10m
DC (@ 24V)
Power + Data (Single Cable)
6 x 1.00 mm
2
Not used
10m
Power + Data (Separate Cables)
2 x 4.00 mm
2
4 x 1.00mm
2
40m
Power only
2 x 4.00 mm
2
Not used
40m