If the scale has been installed between concrete approach slabs, the
customer may anchor the module using the existing holes in the corner base
plates for 1" anchor bolts. RED HEAD and WEJ-IT are two brand names of
expansion anchor bolts but neither are endorsed by Weigh-Tronix, Inc.

Properly install the scale module on an adequate foundation.

Drill a 1" hole, a minimum of 7" deep, in concrete and anchor the scale
module using adequate chemical or epoxy held anchors.

Part

Part Number

S.S.Junction box

C138736

Weigh bar 15' std. cable

271 73-0046

Weigh bar 50' std. cable

271 73-0053

Weigh bar 15' S.S. sheathed cable

27173-0061

Weigh bar 50' S.S. sheathed cable

27173-0079

50' home run std. cable

(1) 7 pin male connector

47662-0034

(2) 7 pin male connectors

13644-0021

50' home run S.S. sheathed cable

(1) 7 pin male connector

52245-0014

(2) 7 pin male connectors

52246-0013

Link

271 71-0014

Pin

26753-0012

24" ground strap

1C00739

40" ground strap

1C01632

Ground strap connector

Protective, nonconductive silicone grease
Electrical Insulating Compound DC4

1C01642

Installation On Concrete Pads With Concrete Approaches

Spare Parts List

Equipement List:

• Rotary hammer drill
• 24” driver pipe for anchor

bolts

• 24” x 2” masonary bit for

anchor bolts

Summary of Contents for BridgePort

Page 1: ...profile self contained portable scale suited for a wide variety of applications It is designed and manufactured for simplified temporary installation and relocation when necessary The basic units are...

Page 2: ...6 below the frost line To speed the installation of the scale ensure the proper installation of the piers before receiving the scale For the dimension information refer to the installation drawing Th...

Page 3: ...ock on the frame Adjust the check bolts to a maximum of 3 16 clearance Refer to Figure 3 Figure 3 Checkbolts Install the optional bulkheads on each end of the scale If the bulkheads are from Weigh Tro...

Page 4: ...d level for a minimum of 10 feet at each end of the scale The ground rods must be installed as close as possible to the scale module at each end and same side as the junction box Connect the ground ro...

Page 5: ...ll the T gap covers optional at each end of the scale to cover the gap between the edge of the scale deck and the bulkhead The scale is now ready for testing calibration and inspection as required Fig...

Page 6: ...n Position each module end to end Make sure the junction boxes remain on the same side of the scale To ensure the proper positioning of the second and third module if appli cable the units must be as...

Page 7: ...ulkhead Weigh Tronix will not be responsible for error caused by other bulkheads Once the bulkheads are properly installed prepare the ramps at each end of the scale The ramps must be straight and lev...

Page 8: ...box connectors Remove the tie down bolts and store them in a safe place for future use Install the hold down bolts to secure the scale weigh bridge to the frame To prevent movement of the scale platf...

Page 9: ...gh bar 15 std cable 271 73 0046 Weigh bar 50 std cable 271 73 0053 Weigh bar 15 S S sheathed cable 27173 0061 Weigh bar 50 S S sheathed cable 27173 0079 50 home run std cable 1 7 pin male connector 47...

Page 10: ...ction box cover to access the potentiometers 2 To capture the value of internal zero for your particular indicator refer to your indicator s Service Manual 3 Use test weights equal to 20 25 of full ca...

Page 11: ...A Weigh Tronix 1000 Armstrong Dr Fairmont MN 56031 USA Telephone 507 238 4461 Facsimile 507 238 4195 e mail industrial weigh tronix com www weigh tronix com Weigh Tronix Canada ULC 217 Brunswick Blvd...

Reviews: