
8
Install T-gap covers over the gap left between each module.
Install T-gap covers to cover the gap between the scale deck and the
bulkhead.
The scale is now ready for testing, calibration, and inspection (if applicable).
Remove all the T-gap covers.
Disconnect all the cables and the ground connectors. Store them in a safe
place for future use.
Apply nonconductive silicone grease on connectors and install the protective
covers on the summing box connectors.
Remove the tie down bolts and store them in a safe place for future use.
Install the hold down bolts to secure the scale weigh bridge to the frame.
To prevent movement of the scale platform, tighten the bumper bolts.
Remove the approaches.
Remove the bulkheads. (if applicable)
If the corner frame on the scale has been anchored (optional), ensure the
removal of these anchors before trying to lift the scale.
Ensure that the scale frame is not jammed in ice or heavy mud.
Use the lifting lugs to lift each module.
Never use the frame to lift the scale module
Figure 10
Triple module wiring
Preparing The Scale Module For Relocation