
Contents
AVENTICS
| ED12 | R414002587–BDL–001–AB
35
Eng
lish
Contents
About this document ....................................................... 37
Related documents ......................................................................37
Abbreviations used ......................................................................37
For your safety ................................................................. 37
Intended use...................................................................................38
Improper use..................................................................................38
Personnel qualifications.............................................................38
Safety instructions in this document......................................39
Observe the following instructions for the ED12 ................40
Delivery contents ............................................................. 42
Applications for the ED12 ............................................... 42
Device description ........................................................... 43
ED12 with M12 plug .....................................................................43
ED12 with two M12 plugs...........................................................44
ED12 with two rectangular plugs ............................................45
Assembling the ED12 ...................................................... 46
Before assembly: ..........................................................................46
Inserting the base plate seal.....................................................48
Placing the ED12 on a base plate ............................................48
Screwing the ED12 onto the base plate.................................49
Connecting the supply voltage and set point .......................49
Commissioning the ED12 ................................................ 52
Before commissioning the ED12 .............................................52
Connecting the base plate pneumatics ................................ 52
Switching on the electrical and pneumatic supply ............53
Setting the set point.....................................................................53
Controlling the ED12 ....................................................... 53
Selecting the correct supply pressure...................................54
“Pressure reached” switch output ....................................... 55
Controlling the pressure.............................................................55
Characteristic curves ................................................................ 56
Outlet pressure 0 to 10 bar ..................................................... 56
Disassembling, exchanging, or disposing of the ED12 57
Disassembling the ED12 ............................................................57
Exchanging the ED12...................................................................57
Disposing of the ED12 .................................................................58