![Avaya VSP 7000 Series Installation Manual Download Page 38](http://html.mh-extra.com/html/avaya/vsp-7000-series/vsp-7000-series_installation-manual_3026748038.webp)
You can proceed with the installation by connecting power and network connections
to the switch.
Checking status LEDs to verify switch installation
You can view the eight status LEDs on the front of the unit to verify the installation and operation
of the hardware.
Before you begin
Perform the following tasks before checking the status LEDs.
• Install the fan trays and power supplies.
• Install the switch in an equipment rack or on a shelf.
• Connect power to the switch.
About this task
Perform the following procedure to verify the hardware installation and operation of the unit.
Procedure
1. Locate the eight status LEDs on the front of the unit, see the following figure.
Switch installation
38 VSP 7000 installation
July 2013
Summary of Contents for VSP 7000 Series
Page 4: ...4 VSP 7000 installation July 2013 Comments infodev avaya com ...
Page 6: ...Installing an MDA 66 Appendix A Hardware reliability 67 6 VSP 7000 installation July 2013 ...
Page 28: ...Installation preparation 28 VSP 7000 installation July 2013 Comments infodev avaya com ...
Page 68: ...Hardware reliability 68 VSP 7000 installation July 2013 Comments infodev avaya com ...