After having assembled all the three legs on the
pier base flange, the pier will look as the picture
on the right, if placed upside down.
At this point, when all the three legs are assembled
on the pier base flange, it is possible to place the
pier in the correct side.
In this condition it is possible to mount the pier top flange on the upper side of the three legs, and, by
screwing the provided screws, close the pier.
The pier completely assembled will look as one shown in the picture below.
©
All Rights reserved
15