Electrical connections must be made in accordance with the installation drawings (
Ch.4.1. ) and electrical
drawings, which remain the reference.
The power and control cables as defined on the installation drawing are the responsibility of the user.
The control cables must be separated from the power cables to avoid interference.
Prior to connecting the power supply, it is essential to make a ground connection using a cable
with a min. cross section of 2.5 mm².
Do not connect to a floating network or to a high-impedance earthed industrial distribution
network.
For each lane:
Open the extension cover located on the right-hand side, in direction of passage A
B (
Disconnect the circuit breaker (18, Ch.3.6. ) (OFF) (
Fixing clamp
(21, Ch.3.6. )
Base frame
85 m
m
*
Fixing of the unit
Concrete
15 mm
* (drilling dia.)
* (drilling depth)