Max Payout - N
Use the + or – key to change between
N
(no) and
Y
(yes). Press ENTER to commit to any
changes.
Max Payout - 01.00
When to choose
Y
the display will show the maximum amount of money to be paid back after a
vend. To change the Maximum payback amount use the selection key pad or the + and – keys.
Press ENTER to commit to the Maximum payback amount.
Payout - Leveling
There are 3 payback options are fewest, MDB level 3 and leveling. Use the + or – key to change
between the 3 different options. Press ENTER to commit to a payback option. Here is a
discription of the three payback options:
Fewest
- This option is the factory default and will always payback the least number of coins
available based on the sensors in the coin mech.
Leveling
- The board makes all the payback decisions based on how much money it thinks is in
each tube. When using this option it is important that you teach the board how much money is in
the coin mech (use "Tube fill" menu item) when you set up the machine.
MDB Level 3
- The changer makes all the pay back decisions based up how much money it
thinks is in the tubes. This option will only work with MDB coin mechs. All payback options will
work with MDB also, you are not limited to this option with MBB coin mechs.
setup menu heading
4.09
M I S MENU
SETUP MENU
C O N F I G U R ATION MENU DIAGNOSTIC MENU
SECURITYMENU
TIMEFUNCTIONS
PRICE MENU
DISPLAY MENU
Summary of Contents for 310
Page 45: ...section 5 parts This Page Intentionally Left Blank ...
Page 46: ...5 01 310 control module cabinet ...
Page 48: ...5 03 310 control module door ...
Page 50: ...5 05 310 swing panel ...
Page 52: ...5 07 310 board and power box assembly 21 24 ...
Page 54: ...5 09 310 power supply box ...
Page 56: ...5 11 320 inside door ...
Page 58: ...5 13 320 thermal window 4 6 2 8 5 12 10 11 14 1 15 13 7 16 3 17 18 ...
Page 64: ...5 19 320 baffle door assembly 8 7 6 6 4 3 5 2 1 10 9 11 ...
Page 66: ...5 21 320 baffle motor assembly 7 8 9 6 5 20 5 19 12 3 2 1 4 18 17 15 16 14 13 11 10 ...
Page 68: ...5 23 320 refrigeration assembly and components 7 6 5 12 10 13 1 4 3 11 8 ...
Page 72: ...5 27 320 junction box side wall mount 14 21 9 2 4 1 17 7 20 6 3 8 5 19 15 ...
Page 74: ...5 29 320 8 select spiral shelf 18 16 17 10 9 11 16 13 14 12 11 9 10 1 15 8 3 2 7 5 4 6 ...
Page 76: ...5 31 320 conveyor shelf 7 4 5 14 13 17 12 10 8 9 6 11 16 2 16 3 1 15 ...
Page 78: ...5 33 320 conveyor module 1 5 4 6 13 14 16 8 7 11 12 17 3 12 20 9 15 2 8 18 19 10 16 ...
Page 80: ...5 35 310 trim Top Trim or Trim Insert Trim Outside Vertical Trim Lower Horizontal Bottom Trim ...
Page 82: ...5 37 310 panels Lower Panel Upper Panel Top Insert ...
Page 89: ...6 01 trouble shooting chart ...
Page 90: ...6 02 trouble shooting chart ...
Page 91: ...6 03 trouble shooting chart ...
Page 94: ...6 06 electrical connections ...
Page 95: ...6 07 electrical connections P7 Default Refrigeration Jumper HI Refrigerated LO Frozen ...
Page 96: ...notes ...
Page 97: ......
Page 98: ...55 ...
Page 99: ......
Page 100: ...55 ...