Id.Nr.: 243701-0
|
35
13.3 CONNECTION DIAGRAM EKH-S
Tubular heating
element kW
200 Liter
150 Liter
120 Liter
100 Liter
C
4
3
2
1
PE
4
3
2
1
4
PE
3
2
1
L
N
3N~400V
3~400V
~230V
M
R2
R2
R1
R1
R3
R3
C
C
D
B
B
A
N
(Switching installed at the factory 6 hours heating time)
3.2
2
.
2
2
.
3
2.2
1.2
1.2
3.1
1
.
2
1
.
3
2.1
1.1
1.1
L3
L2
L1
Reconnectable heating outputs in kW
h
3 1/3
h
4
h
6
h
8
h
r3
r1
r2
3~400V
~230V
16
+°C
+°C
STB
TR
+°C
+°C
STB
A
R1
TR
R2
R3
B
A
3.2
2.2
1.2
3.1
2.1
1.1
L3
L2
L1
+°C
+°C
STB
TR
PE
M045/24369
5
1,65
50 Liter
3N~400V
h
0,30
3 1/3
2,30
1,65
1,35
1,10
0,85
0,65
2,95
2,30
2,00
1,75
1,15
3,30
2,70
2,20
1,70
3,35
2,85
h
3 1/3
h
4
4,70
3,70
3,20
2,80
2,00
1,60
1,30
0,95
2,30
1.65
1,35
1,10
0,85
0,65
0,65
0,65
0,65
0,65
0,30
0,30
2,30
0,65
0,85
Volume
80 Liter
1,10
1,35
1,60
2,00
2,85
3,35
3,95
5,25
Heating time Cable
3 1/3 h
A,B,C
at therm. terminal 1.2
D
at therm. terminal 2.2
4 h
A,C
at therm. terminal 1.2
B
remove
D
at therm. terminal 2.2
8 h
A
at therm. terminal 1.2
B,C
remove
D
at therm. terminal 2.2
16 h
A,C
remove
B
at therm. terminal 1.2
Heating time Cable
3 1/3-4 h
A
at therm. terminal 1.2
B
at therm. terminal 2.2
C
at therm. terminal 3.2
D
remove
Heating time Cable
3 1/3 h
A
at therm. terminal 1.2
B
at therm. terminal 2.2
C
at therm. terminal 3.2
D
remove
Switching installed at the fac
to
ry
6 hours heating time
16 hrs.
r3
r1
r2
8 hrs.
6 hrs.
4 hrs.
3 1/3 hrs.
4 hrs.
3 1/3 hrs. 3 1/3 hrs.
Reconnectable heating output in kW
Tubular heating
element kW
0,30
0,65
0,85
1,10
1,35
1,65
2,30
0,30
0,30
0,65
0,65
0,65
0,65
0,65
0,85
1,10
1,35
1,65
2,30
0,65
0,85
1,10
1,35
1,65
2,30
0,95
1,15
1,75
2,00
2,30
2,95
1,30
1,70
2,20
2,70
3,30
1,60
2,00
2,85
3,35
3,70
4,70
2,80
3,20
1,60
2,00
2,85
3,35
3,95
5,25
EKH-S 050
EKH-S 150
EKH-S 080
EKH-S 200
EKH-S 100
EKH-S 120
~230V
3~400V
3N~400V
Type