EN
31
Type
Tubular heating
element
Reconnectable heating output in kW
kW
~230V
3N~400V
3N~400V
r3
r1
r2
16 hrs. 8 hrs. 6 hrs. 4 hrs.
3 1/3
hrs.
4 hrs.
3 1/3
hrs.
3 1/3 hrs.
EKH-S 050
0,65 0,30 0,65
0,30
0,65
0,95
1,30
1,60
1,60
EKH-S / EKL / ES 080
0,85 0,30 0,85
0,85
1,15
1,70
2,00
2,00
EKH-S / EKL 100
1,10 0,65 1,10
1,10
1,75
2,20
2,85
2,80
2,85
EKH-S / EKL 120
1,35 0,65 1,35
1,35
2,00
2,70
3,35
3,20
3,35
EKH-S / EKL 150
1,65 0,65 1,65
1,65
2,30
3,30
3,70
3,95
EKH-S / EKL 200
2,30 0,65 2,30
2,30
2,95
4,70
5,25
Connection Diagram EWH
L, N...Versorgungsnetz
Connecting voltage: ~230V
50 - 150 litres wall-mounted tank 8h
50 - 150 litres wall-mounted tank 6h
50 - 150 litres wall-mounted tank 4h
FIRST COMMISSIONING
The tank must be filled with water before switching on the electricity.
The expansion water created in the internal boiler during the heating process must drip from the safety
valve in the case of pressure-type connection, and from the overflow mixing tap in the case of pressure-
less connection.
Caution: The first heating process must be implemented and monitored by a licensed expert.
The hot water drain pipe as well as parts of the safety fitting may become hot.
The preset temperature and the actual temperature of the water withdrawn should correspond approxi-
mately after completed heating.
DECOMMISSIONING, EMPTYING
If a water heater is taken out of operation or unused for a longer period of time, it must be emptied and
disconnected all-pole from the electric power grid. Turn off the lead switch or the automatic cutout.
In rooms with a permanent risk of frost, the water heater must be emptied before the start of the cold sea-
son, insofar as the device remains out of operation for several days and is not operated in the anti-frost
position.
CAUTION!
The internal circuit
must not be
changed!