17
YL-250 5000KG 2 BASE PLATE CAR HOIST
Installation and operation manual
INSTALL BALANCE CABLE
3. Thread through the carriages and
secure at the top of the carriages.
1. The balance cable passes through
the carriages along the top pulley.
2. Bypass two rows of
bottom pulleys
One end of the balance cable has been
installed prior to shipment
HIGH-LIFT