YL-250 5000KG 2 BASE PLATE CAR HOIST
Installation and operation manual
7
SELECTING SITE
Before installing your new lift, check the following.
1.
LIFT LOCATION:
Always use architect’s plans when available.
Check layout dimension against floor plan requirements making
sure that adequate space is available.
2.
OVERHEAD OBSTRUCTIONS:
The area where the lift will be
located should be free of overhead obstructions such as heaters,
building supports, electrical lines etc.
3.
DEFECTIVE FLOOR:
Visually inspect the site where the lift is to be
installed and check for cracked or defective concrete.
4. Lift is designed for
INDOOR INSTALLATION ONLY
.
Outdoor use permitted only if covered and dry. Always follow
warnings illustrated on equipment labels.
FLOOR REQUIREMENTS
This lift must be installed on a solid level concrete floor with no
more than 3°s of slope. Failure to do so could cause personal injury
or death.A level floor is suggested for proper use and installation
and level lifting. If a floor is of questionable slope, consider a survey
of the site and/or the possibility of pouring a new level concrete slab.
• DO NOT install or use this lift on any asphalt surface or any surface
other than concrete.
• DO NOT install or use this lift on expansion seams or on cracked or
defective concrete.
• DO NOT install or use this lift on a second/elevated floor without
first consulting a building architect.
When removing the lift from shipping angles, pay close attention as
the posts can slide and can cause injury. Prior to removing the bolts
make sure the posts are held securely by a fork lift or some other
heavy lifting device
SAVE THESE INSTRUCTIONS
IMPORTANT NOTICE
THESE INSTRUCTIONS MUST BE FOLLOWED TO ENSURE PROPER INSTALLATION AND OPERATION OF YOUR LIFT. FAILURE TO COMPLY
WITH THESE INSTRUCTIONS CAN RESULT IN SERIOUS BODILY HARM AND VOID PRODUCT WARRANTY. MANUFACTURER WILL ASSUME NO
LIABILITY FOR LOSS OR DAMAGE OF ANY KIND, EXPRESSED OR IMPLIED, RESULTING FROM IMPROPER INSTALLATION OR USE OF THIS
PRODUCT. PLEASE READ ENTIRE MANUAL PRIOR TO INSTALLATION.
CAUTION
DANGER
DANGER
DANGER
WARNING
ALL MODELS MUST BE INSTALLED ON 3000 PSI
CONCRETE ONLY CONFORMING TO THE MINIMUM
REQUIREMENTS SHOWN ABOVE. NEW CONCRETE MUST
BE ADEQUATELY CURED FOR A MINIMUM OF 28 DAYS.
HIGH-LIFT