22
LKS
- S2 24V DC
Operation of the power-operated window
When operating the power-operated window safety
instructions must be observed, specifi cally those pertaining
to commissioning, operation and maintenance.
Check the mounted system for its safety; perform test run
and commissioning.
Safety test:
• Connect operating voltage.
• Check fastening (frame brackets, casement brackets)
for fi rm fi t or tightening.
Test run:
• Visual inspection of casement movements.
• Stop immediately by malfunction!
• Pay attention to collision with facade construction and
correct installation, if required.
Risk evaluation:
Before operating a power-operated window to which
window drives were mounted, which were sold by the
manufacturer as incomplete machines according to instal-
lation declaration, the possible risk to ahazard of persons
must be determined, evaluated and minimized by taking
appropriate technical measures in accordance with the Ma-
chinery Directive. Separate documents for performing a risk
assessment can be downloaded from the homepage of
Firm
a
UMÜlleR
a
UMatIc
GmbH
(
www.aumueller-gmbh.de
).
S
afety
CheCk
anD
t
eSt
Run
Formula to calculate
the required wire cross-section of a supply line
Calculation example
Available data:
• cut-off current per drive (i. e. 2 x 4.0A) from data sheet
• length to be bridged from the last window to the control unit
(i. e. 10 meters)
A
I
L
2
2,0
56
mm
2
=
(total) *
*
*
(length supply line)
V
A
m
(voltage drop)
m / (Ω*mm
2
)
(2 * 4,0A) * 10m * 2
A =
2,0V * 56m / (Ω*mm
2
)
A = 1,42mm
2
->
1,5mm
2
chosen
S
uPPly
lineS
of
C
ontRol
u
nit
to
the
D
RiVeS
Laying and connecting the drive cable
• Avoid extreme temperature differences in the instal-
lation area (danger of condensation).
• Set clamping point close to window and ensure
accessibility.
• Ensure expansion possibilities of the drive and the drive
cable.
• Consider the cable length and the cross sections of
the drives supply lines.
24V
Observe current regulations and guidelines regarding
the “Fire behavior of building materials-circuit integrity
maintenance of electric cable systems“ (E30, E60, E90) and
the prescribed constructional regulations!
R
eCommenDation
For safety reasons a cable of the next hig-
her wire cross section should be selected.
I
nstallatIon
step
8:
I
nstallatIon
step
7:
07
e
leCtriC
C
onneCtion
/ s
afety
C
heCk