LKS 

- S2 24V DC

P

reParing

 a

ssembly

I

nstallatIon

 

step

  1: 

i

nSPeCtion

 

befoRe

 

the

 

inStallation

Test kit for drives

Order number:                       
Application:

Supply voltage:  
Drive types: 

   

Drive current:

   

Display:

    

Ambient temperature:  
Plastic housing:  
Weight:     
Feature / equipment:    

533981

Test kit to check running direction and 
communication of drives 24V DC or 
230V AC (including batteries)
230V AC
24V DC / 230V AC
max. 3 A
drive current, battery charge 
-5 °C ... + 40 °C 
250 x 220 x 210 mm 
approx. 3,6 kg 
Control elements: 2 sw 1 button

n

ote

We recommend the use of our test kit for 
the inspection of drives with the rated 
voltage 24V= / 230V~ (see table below). 
Damaged products may not be operated 
under any circumstance.

It is imperative that the suffi ciently
mechanical stiffness of the fastener type 
as well as of the swivel range of the drive 
is observed. 
If this is not guaranteed another type of 
fastening or another type of drive must 
be selected.

!

The support surface of the frame brackets or 
casement brackets must rest completely on 
the window or frame profi le. There must be
no tilting of the fastening elements during
extension and retraction of the drives. A
safe and solid fastening must be ensured
at the window profi le.

Storage of drives at the construction site

Protective measures against damages, dust, moisture or 
contamination shall be taken. Store drives intermediately 
only in dry and well ventilated rooms.

Inspection of drives before installation

Check drives and window before installation for good
mechanical condition and completeness. The chains / spind-
les of the drives must be extendable or retractable easily. 
The casement must run smoothly and the weight must be 
in balance.  

The test procedure of drives may only be performed on a 
non-slip and secured mat or a test fi xture. During the test 
run the test element must not be interfered with. The test 
my only be conducted by or under the supervision of expert 
personnel.
For testing chain drives the chain must be extended and 
retracted at an angle of approx. 90°. The spindle tubes of 
spindle drives in round housing tubes must be secured 
against independent spinning before starting the test to 
avoid deviations in the integrated position encoder.

Inspection of the intended use

The planned use of the drive must be checked for com-
pliance with its intended use. If used otherwise the liability 
and warranty claim expires.

  

Predictable misuse 

It is imperative that foreseeable misuse of drives is avoided! 
Here are a few examples:
•  do not connect 24 V DC drives to a 230 V AC mains
 voltage,
•  observe synchronous run and sequence control by drives
  with multiple interconnection (if existing), 
•  use drives only indoors,
•  avoid additional force infl uences, e.g. transverse forces.

Testing mechanical requirements 

Prior to the start of the installation check whether :
•  the support surface and the profi le static for the load 
  transmission is suffi cient,
•  a support construction for the secure fastening of the
  drives is required,
•  cold bridges (thermal separation) are avoidable at
  action points,
•  there is suffi cient space for the swivel movement of the
 drive.
If not, counter measures must be taken!

!

C

aution

!

w

aRning

Important instructions for a safe instal-
lation. Observe all instructions, wrong 
installation may result in serious injury! 

Ubatt

fmot

Imax

Imot

__________ 

__________ 

__________ 

__________

_________ 

Imp/s

Umot

A

 A

V

       V

__________ 

 A

=

 =

=

       =

_________ 

%

0

0

A

24 V =

B

230 V ~

Lιι

N

PE

Prüfkoffer / Test Kit

24 V =   /  230 V~

OFF

A

B

ON

24 V =

230 V ~

Spannung

voltage

Taster

push button

Schalter

switch

04

04

Summary of Contents for LKS S2 24V DC

Page 1: ...according to Machinery Directive 2006 42 EC annex VI LKS S2 24V DC Rack and Pinion Drives for windows Assembly and Commissioning Instructions...

Page 2: ...a Assembly drive with frame bracket K29 Installation step 4b Assembly drive with adjustable clamping B7 and frame bracket K82 Installation step 4c Assembly drive with adjustable clamping B7 and frame...

Page 3: ...ng Caution Warning Danger due to electric current Caution Warning Risk of crushing and entrapment during device operati on is provided as a sticker with the drive Attention Warning Risk of damage to d...

Page 4: ...s NSHEV natural smoke and heat exhaust ventilator s in accordance with EN12101 2 without dual purpose for ventilation The need for a risk assessment at the installation site due to the reasonably fore...

Page 5: ...witch strips or Motor current monitoring systems internal and external Hold to run switch stops movement at HSK 20 mm at a closing force of 150 N at HSK 20 ZAA 5 Operating element in direct range of v...

Page 6: ...e electrical supply data see product lable and performance limits see technical data as well as the mounting and installation instructions of the drive must be strictly observed and adhered to Do not...

Page 7: ...able cable lengths and cross sections shall be selected in accordance with the manufacturer s technical data If necessary the cable types shall be coordinated with the competent local authorities and...

Page 8: ...e instructed in all important opera ting steps If necessary he must be advised of all remaining risks dangers The end user shall be specifically instructed that no additional forces except pushing and...

Page 9: ...e and heat exhausting systems SHEV as single drive Internal load dependend cut off switch S2 Options Drillings for front suspension Monitored motion run of 2 drives up to s 300 mm via USKM Order data...

Page 10: ...formation on the most import ant caracteristics such as manufacturer s address article reference number and name technical caracteristics date of manufacturing with firmware version serial number cert...

Page 11: ...2200 2400 2600 Abstand Antrieb Band ffnungswinkel 2 1 3 4 5 6 7 8 9 10 1 Hubl nge 100 mm 2 Hubl nge 200 mm 3 Hubl nge 300 mm 4 Hubl nge 400 mm 5 Hubl nge 500 mm 6 Hubl nge 600 mm 7 Hubl nge 700 mm 8...

Page 12: ...balance The test procedure of drives may only be performed on a non slip and secured mat or a test fixture During the test run the test element must not be interfered with The test my only be conducte...

Page 13: ...2 FAB 1 2 FAB 1 4 FAB 1 4 FAB Tools required Marker Grains Hammer Screwdriver slotted head cross or Torx size by site conditions Hexagonal wrench size 4 5 Fork wrench for SW13 SW14 Torque wrench Power...

Page 14: ...et K82 for swivelling suspension Frame bracket K5 for swivelling suspension Adjustable clamping B7 Mounting with K5 or K82 Frame bracket K21K For moving the mounting level from the horizontal to the v...

Page 15: ...g casement outwards opening Frame assembly HSK View on aluminium window View on PVC window Roof window outwards opening Frame assembly HSK Roof window outwards opening Frame assembly HSK View on alumi...

Page 16: ...associated bolt 6 of the casement brackets F1 into the eyebolt of LKS Optionally adjust the pressure ball of the casement bracket F1 with grub screw and the spring Adjust casement pressure using of th...

Page 17: ...linder head screws M6 of the adjustable clamping B7 Slide the adjustable clamping B7 gently on the drive body LKS by hand do not force Screw the cylinder head screws M6 of the adjustable clamping B7 a...

Page 18: ...e bracket K21K M6 Make sure they are parallel to casement edge Casement bracket center and rack must be in line Determine fastenings for casement bracket F10 6 frame bracket K21K and for frame bracket...

Page 19: ...arefully clear away drilling swarfs to prevent seals from being damaged Avoid surface scratches for example by using masking tape Secure fasteners against loosening e g by applying removable thread lo...

Page 20: ...propriate cross section for mounting dimensions see drill holes Installation stepe 3 or project specific documents and drawings Note Screws for mounting on the window are to be provided by the custome...

Page 21: ...s s 300 mm max 2 5 A IP 54 0 C 70 C 110 x 110 x 66 mm Motion monitoring up to 3 drives 2 sequential controls DIP switches for settings Connection terminals 2 5 mm 24V Installation step 6 Electric conn...

Page 22: ...he homepage of Firm aUM lleR aUMatIc GmbH www aumueller gmbh de Safety CheCk anD teSt Run Formula to calculate the required wire cross section of a supply line Calculation example Available data cut o...

Page 23: ...ear or damages of cables and fastening elements must be performed During maintenance contaminations must be removed from the drive Fastenings and clamping screws must be checked for tightness Test run...

Page 24: ...or delivered material is twelve months Warranty and liability claims for personal injuries or material damages are excluded if caused by one or more of the following No proper incoming goods inspectio...

Page 25: ...25 LKS S2 24V DC Notes 08...

Page 26: ...26 LKS S2 24V DC Notes 08...

Page 27: ...s and Conditions of aUM lleR aUtoMatIc GmbH apply to all offers supplies and services The publication of these assembly and commissioning instructions supersedes all previous editions CeRtifiCate anD...

Page 28: ...9000028501_V0 1_KW05 20...

Reviews: