12
LKS
- S2 24V DC
P
reParing
a
ssembly
I
nstallatIon
step
1:
i
nSPeCtion
befoRe
the
inStallation
Test kit for drives
Order number:
Application:
Supply voltage:
Drive types:
Drive current:
Display:
Ambient temperature:
Plastic housing:
Weight:
Feature / equipment:
533981
Test kit to check running direction and
communication of drives 24V DC or
230V AC (including batteries)
230V AC
24V DC / 230V AC
max. 3 A
drive current, battery charge
-5 °C ... + 40 °C
250 x 220 x 210 mm
approx. 3,6 kg
Control elements: 2 sw 1 button
n
ote
We recommend the use of our test kit for
the inspection of drives with the rated
voltage 24V= / 230V~ (see table below).
Damaged products may not be operated
under any circumstance.
It is imperative that the suffi ciently
mechanical stiffness of the fastener type
as well as of the swivel range of the drive
is observed.
If this is not guaranteed another type of
fastening or another type of drive must
be selected.
!
The support surface of the frame brackets or
casement brackets must rest completely on
the window or frame profi le. There must be
no tilting of the fastening elements during
extension and retraction of the drives. A
safe and solid fastening must be ensured
at the window profi le.
Storage of drives at the construction site
Protective measures against damages, dust, moisture or
contamination shall be taken. Store drives intermediately
only in dry and well ventilated rooms.
Inspection of drives before installation
Check drives and window before installation for good
mechanical condition and completeness. The chains / spind-
les of the drives must be extendable or retractable easily.
The casement must run smoothly and the weight must be
in balance.
The test procedure of drives may only be performed on a
non-slip and secured mat or a test fi xture. During the test
run the test element must not be interfered with. The test
my only be conducted by or under the supervision of expert
personnel.
For testing chain drives the chain must be extended and
retracted at an angle of approx. 90°. The spindle tubes of
spindle drives in round housing tubes must be secured
against independent spinning before starting the test to
avoid deviations in the integrated position encoder.
Inspection of the intended use
The planned use of the drive must be checked for com-
pliance with its intended use. If used otherwise the liability
and warranty claim expires.
Predictable misuse
It is imperative that foreseeable misuse of drives is avoided!
Here are a few examples:
• do not connect 24 V DC drives to a 230 V AC mains
voltage,
• observe synchronous run and sequence control by drives
with multiple interconnection (if existing),
• use drives only indoors,
• avoid additional force infl uences, e.g. transverse forces.
Testing mechanical requirements
Prior to the start of the installation check whether :
• the support surface and the profi le static for the load
transmission is suffi cient,
• a support construction for the secure fastening of the
drives is required,
• cold bridges (thermal separation) are avoidable at
action points,
• there is suffi cient space for the swivel movement of the
drive.
If not, counter measures must be taken!
!
C
aution
!
w
aRning
Important instructions for a safe instal-
lation. Observe all instructions, wrong
installation may result in serious injury!
Ubatt
fmot
Imax
Imot
__________
__________
__________
__________
_________
Imp/s
Umot
A
A
V
V
__________
A
=
=
=
=
_________
%
0
0
A
24 V =
B
230 V ~
Lι
Lιι
N
PE
Prüfkoffer / Test Kit
24 V = / 230 V~
OFF
A
B
ON
24 V =
230 V ~
Spannung
voltage
Taster
push button
Schalter
switch
04
04
Summary of Contents for LKS S2 24V DC
Page 25: ...25 LKS S2 24V DC Notes 08...
Page 26: ...26 LKS S2 24V DC Notes 08...
Page 28: ...9000028501_V0 1_KW05 20...