Continuous sealer
D541
Maintenance
27
7.1 Maintenance schedule
7.1.1 Weekly
maintenance
Weekly maintenance should be carried out by the operating
personnel (see chapter 2 - ’Safety’).
7.1.2 Monthly
maintenance
Monthly maintenance should only be performed by authorised
maintenance personnel (see chapter 2 - ’Safety’).
7.1.3 Annual
maintenance
Annual maintenance should only be performed by authorised
maintenance personnel (see the preface).
Part
Work
Sealer
Clean the sealer with a damp cloth and mild soap (for
example, all-purpose cleaner).
Part
Work
PTFE fibreglass belts
Check the condition of the PTFE fibreglass belts.
Replace it if necessary.
(see section 7.2 - ’Replacing the PTFE fibreglass
Part
Work
Earth system
Check the earth according to NEN 3140 or
EN 50110-1.