![ATWELL UMD-SRB01 Installation Manual Download Page 22](http://html1.mh-extra.com/html/atwell/umd-srb01/umd-srb01_installation-manual_3006104022.webp)
21
UMD-SRB01
Version 4
Test Deployment of Brakes
To test deployment of the rope brakes follow the procedure below.
Note: this will also send an emergency stop signal to the main lift panel to
prevent the lift from moving. This stop signal can also be tested this way.
n
Check that there is power at the controller i.e. “Control Voltage” LED is
illuminated.
n
Press the emergency stop button.
n
The brakes will be immediately de-energised and subsequently deployed.
n
Check that both brakes SET LEDs have been extinguished.
n
Check that Emergency Brake deployed LED is illuminated.
To reset
Twist and Pull out emergency stop button.
Turn key switch to reset.
Lift up both rope brakes
Return key switch to run position.
Please note the Key is retained in either Test or reset positions. It can
only be removed when in the normal run position.