Atwell International Limited
Once the control box is in place, cable runs can commence. See Drg. page 16
CONNECTION OVERVIEW DIAGRAM for help to plan the cable runs.
There is a 32 way connector supplied, which has an
industry standard PG thread. It is intended that flexible
armoured conduit is used to prevent strain and damage
to the individual cores.
We would strongly suggest that the power is fed from
the main lift panel protected by a circuit breaker Type
D rated at 3 Amps. The cable run should be as short as
possible. If the length does not exceed 2 metres the
size should be at least 1.5 mm
2
. Stranded tri-rated PVC
insulated. It should also comply with local regulations.
The 32-way connector is fitted so as to prevent the need for access inside
of the control box. If you should need access to the inside of the control box
please contact Atwell International for written consent as your warranty may be
invalidated if the internal seals are broken.
During wiring great care must be taken to ensure that there is no risk of short
circuits from stray strands, cross connection, loose terminals or strain on cable
joins. All terminations should be made using boot lace ferrules or similar and
each wire appropriately identified with its corresponding wire number at each
end of the cable. Wiring of power and internal main lift connections must be
carried out by a competent electrician, and checked prior to applying power.
Wiring
230V
Danger
Isolate main
supply
before opening