![ATS US-2000 V5 Service Manual Download Page 6](http://html1.mh-extra.com/html/ats/us-2000-v5/us-2000-v5_service-manual_3005199006.webp)
US
-
2000
(
DCP 2000 V
V5)
SERVICE MANUAL
CE
Fertigstellung: 02.16
US - 2000
g
g
Serviceanleitung_US2000V5_EN_V0.0.docx
Page 5 of 23
Maintenance
1.2.
Cleaning of the band channel
Procedure:
1.
Remove the band from the arch by resetting the machine.
2.
Operate the release lever and pull the start of the band out of the band channel.
3.
Fold down the front panel.
4.
Remove all three band channel quick release clamps (A).
5.
Carefully move the right feed track cover (B) to the right while lifting the rotary encoder (C).
6.
Carefully pull the left feed track cover (D) forward.
7.
Carry out the cleaning: Band drive roll aluminum (E), rubber feed roller (F), feed track and feed track
covers
8.
Assemble in reverse order.
9.
Thread the band according to instructions.
Important: Band channel incl. lid, rotary encoder, aluminum and rubber feed roller must in no case be cleaned using abrasive
cleaning agents or other abrasive agents (e.g. file).
Important: When assembling the band channel quick release clamps (A) make sure that the knurled screws are at the bottom,
as shown in the picture.
Band channel of US
-
AD Arch machine
A
A
2000
E
F
D
B
A
A
A
C
Band channel of US
-
LD Loop machine
L
L
2000
A
A
A
D
E
F
B
C