
44
b. Verify that the temperature display on the thermometer
matches the temperature display on
the PAV. Allow temperature to reach setpoint and
stabilize for one hour.
c. Note any difference and call ATS for calibration or use
the difference to offset future tests.
NOTE: Do not verify temperature and pressure at the same time.
6.2 Verifying Pressure
To verify pressure:
1. Remove the screw in top of the vessel lid.
2. Screw the pressure gage into that space. Make sure the lid is
secured according to the directions in Section 5.
3. Apply the pressure to the PAV. Allow pressure to reach 2.1 0.1
MPa and stabilize for fifteen minutes.
4. Verify that the display on the pressure gage matches the
displayed pressure on the PAV display.
5. Note any difference and call ATS for calibration if the difference
falls out of specification.
NOTE: It is best to have the PAV setpoint at a low temperature and
the Soak Time set for five minutes.
NOTE: Do not verify temperature and pressure at the same time.