MAN - BBR2S - REV: Original | D. Installation
15
shroud (Figure D.7). Lift the lower portion of the shroud up and gently screw it in to the upper portion (Figure D.8).
D.4 Connecting Equipment
The following hoses and cables are shipped with the BBR2S. Use them for connecting the BBR2S equipment and
refer to Figure D.10 on p.16.
• Zero/Load Hose (Item 2)
• Air Bearing Hose (Item 2)
• Temperature Sensor Cable (integral to base) (Item 4)
• Four Color-Coded Electrical Cables (integral to base) (Item 6)
• Communication Cable (USB-A to USB-B) (Item 5)
• Main Electrical Power Cable(s) (Item 3)
1. Connect the air hose ports on the rear of the base unit. The air supply connections supply a minimum of 60psi
of clean, dry air. Make sure the location of the air hoses are such that they will not snag or catch on anything in the
surrounding environment.
2. Connect the temperature sensor cable from the BBR base to the refrigeration unit.
3. Connect the color-coded electrical cables from the rear of the base unit to the rear of the load frame assembly.
4. Connect all needed cables and equipment for the computer system.
5. Connect the communication cable between the rear of the base unit and the computer system.
6. Plug the power cables from the base unit, the computer system, and the refrigeration unit into a surge-protected
power source of appropriate voltage. Refer to the data tag of the BBR2S base unit.
NOTE: If at any point power is lost, disconnect all power sources and place all controls in an
OFF position. Reconnect power sources and restart the system.
Figure D.7 - Attaching lower
portion of Load Shroud
Figure D.8 - Attaching lower
portion of Load Shroud
Figure D.9 - Attached Load Nose with
Shroud