
7-15
Mechanism
7.4 The Fully-Enclosed Splash-Guarding Enclosure
A fully-enclosed sheet metal enclosure is designed to isolate the running machine
and the cutting coolant and flying chips it generates from the operator. Chips are
conveyed to the chip-collecting bucket through the chip conveying tunnel. The
circulating cutting coolant is pumped through the coolant filters to the coolant
distributors. Ensure to clean the coolant filters frequently. The sheet metal
enclosure is designed to have a 2-pieces front door so that you can inspect the
machine or install the workpiece easily.
Note
: Ensure to close the 2-pieces front door before starting up the machine. The
running machine will be stopped if the front door is opened in order to protect the
operator from flying chips, spraying cutting coolant and running machine.
Nevertheless, make sure the machine is fully stopped before entering inside the
sheet metal enclosure.
Summary of Contents for AL52
Page 1: ...AL52 AM52...
Page 4: ......
Page 5: ...Chapter 1 Machine Safety Regulation...
Page 29: ...Chapter 2 Machine Specification...
Page 37: ...2 8 Machine Specification AL52 Column height...
Page 40: ...Machine Specification 2 11 2 10 Dimensions of the Working Table AL52 AM52...
Page 41: ...2 12 Machine Specification 2 11 Dimensions of the Tool Holder 2 11 1 BT 40 JIS Specification...
Page 42: ...Machine Specification 2 13 2 11 2 V40 ANSI Specification...
Page 43: ...2 14 Machine Specification 2 11 3 V40 CT Specification...
Page 44: ...Machine Specification 2 15 2 11 4 CAT 40 Specification Unit inch...
Page 45: ...2 16 Machine Specification 2 12 Specifications of the Tool...
Page 48: ......
Page 49: ...Chapter 3 Shipping Handling and Installation...
Page 52: ...Shipping Handling and Installation 3 3 AL52 AM52...
Page 54: ...Shipping Handling and Installation 3 5...
Page 63: ...3 14 Shipping Handling and Installation...
Page 72: ...Chapter 6 Lubrication...
Page 76: ...6 4 Lubrication EV 860 1050 Operation s Maintenance Manual AM52...
Page 80: ...Chapter 7 Mechanism...
Page 97: ...7 17 Mechanism...
Page 98: ...Chapter 8 Pneumatic Coolant Systems...
Page 101: ...8 3 Pneumatic Coolant Systems 8 2 Schematic Diagram of the Pneumatic Piping System...
Page 105: ...8 7 Pneumatic Coolant Systems 8 5 Schematic Diagram of the Coolant System...
Page 106: ...Chapter 9 Preventive Maintenance...
Page 110: ...PARTS NO MM0100030A Mar 2019...