3-4 Shipping/Handling and Installation
3.2 Machine Lifting
This
AL52/AM52
vertical machining center is composed of headstock, tool magazine,
main column, working table, saddle, bed base, operation panel, pneumatic system,
lubrication system, electrical cabinet and CNC unit. Those components are connected
with electrical cables and/or pneumatic pipelines.
During transportation, the machine body and coolant tank are packed separately. The
shipping and handling equipment used should be able to lift a gross weight
AL52/AM52
of
10.5
tons at least. Due to weight of the machine, it is recommended to
lift this machine with crane, and use only the sling frame provided by us. Nevertheless,
read Operator and Maintenance’s manuals thoroughly before lifting the machine.
Note
: Use only the sling frame provided by us to lift the machine.
3.2.1 Precautions before Lifting the Machine
3.2.1.1 Ensure that strength of the cables can sustain the weight of the machine.
3.2.1.2 Ensure the lifted machinery package is in balance before starting to move it.
3.2.1.3 Abrupt changes in lifting & lowering speed might cause unexpected damage
on the machinery package and are therefore prohibited.
3.2.1.4 Use only the sling frame provided by us to lift the machine. Because the sling
frame is optional, therefore, please contact our local dealers if it is needed.
3.2.2
Lifting with the Machine Packed
3.2.2.1 Using Fork-lifting Truck
3.2.2.1.2 The loading capacity of the forklift should be at least
AL52/AM52
of
10.5
tons The
AL52/AM52
packed machine is
438
cm in length,
270
cm in width
and
301
cm in height. Ensure nobody is in the way and the path is clear
before moving the packed machine.
3.2.2.1.3 Ensure lifting forks are in an appropriate position and the package is in
balance before proceeding.
3.2.2.1.4 Beware that the lifting truck might be overturned because of an improper
lifting height.
3.2.2.1.5 Always assign a person to guide the way to ensure safety.
Summary of Contents for AL52
Page 1: ...AL52 AM52...
Page 4: ......
Page 5: ...Chapter 1 Machine Safety Regulation...
Page 29: ...Chapter 2 Machine Specification...
Page 37: ...2 8 Machine Specification AL52 Column height...
Page 40: ...Machine Specification 2 11 2 10 Dimensions of the Working Table AL52 AM52...
Page 41: ...2 12 Machine Specification 2 11 Dimensions of the Tool Holder 2 11 1 BT 40 JIS Specification...
Page 42: ...Machine Specification 2 13 2 11 2 V40 ANSI Specification...
Page 43: ...2 14 Machine Specification 2 11 3 V40 CT Specification...
Page 44: ...Machine Specification 2 15 2 11 4 CAT 40 Specification Unit inch...
Page 45: ...2 16 Machine Specification 2 12 Specifications of the Tool...
Page 48: ......
Page 49: ...Chapter 3 Shipping Handling and Installation...
Page 52: ...Shipping Handling and Installation 3 3 AL52 AM52...
Page 54: ...Shipping Handling and Installation 3 5...
Page 63: ...3 14 Shipping Handling and Installation...
Page 72: ...Chapter 6 Lubrication...
Page 76: ...6 4 Lubrication EV 860 1050 Operation s Maintenance Manual AM52...
Page 80: ...Chapter 7 Mechanism...
Page 97: ...7 17 Mechanism...
Page 98: ...Chapter 8 Pneumatic Coolant Systems...
Page 101: ...8 3 Pneumatic Coolant Systems 8 2 Schematic Diagram of the Pneumatic Piping System...
Page 105: ...8 7 Pneumatic Coolant Systems 8 5 Schematic Diagram of the Coolant System...
Page 106: ...Chapter 9 Preventive Maintenance...
Page 110: ...PARTS NO MM0100030A Mar 2019...