Installation, Operation & Maintenance Guide
Matterhorn 1000/1002
2
1-888-MY-AIR11 CAG-06-21-003 AtmosAir.com
Trademarks
Any brand names and product names included in this document are trademarks, registered trademarks, or trade names of their
respective holders.
To the Holder of this Document
The contents of this document are current as of the date of publication. AtmosAir® reserves the right to change the contents
without prior notice.
In no event will AtmosAir be liable for any special, incidental, or consequential damages or for commercial losses even if AtmosAir
has been advised thereof as a result of issue of this document.
WARNING
Failure to follow this warning could result in personal injury or death.
For installation you
MUST:
■ Always disconnect all electrical power to the unit before handling any of the components, to the air handler before removing access
panels, or to perform any maintenance activities.
■ Do NOT connect to the power before the installation is complete and personnel are aware of the imminent operation – secondary
voltage to the ionization tube can be as high as 3,000 VAC.
■ Installation of AtmosAir equipment is not to be performed in areas with extreme conditions such as extreme heat or cold, or where
water or condensing moisture can impact the system.
■ Carefully read this instruction booklet before beginning the installation.
■ Follow each installation or repair step exactly as shown and explained in this guide.
■ Observe all local, state, national, and international electrical codes.
■ Pay close attention to all warnings and caution notices given in this guide.
1.
Before installing or servicing system, always turn off main power to system.
Note:
There may be more than one disconnect switch.
2.
AtmosAir equipment must be installed with a proper ground. The electrical cable enclosed with your AtmosAir unit must be
used as it has a special plug which provides a ground circuit for the equipment.
3.
Always replace fuse with the same rating and type of fuse.
4.
Failure to follow this caution may result in personal injury or product and/or property damage.
5.
Although special care has been taken to minimize sharp edges in the construction of your unit, be extremely careful when
handling parts or reaching into the unit.
6.
Keep path clear near and in front of intake screen.
7.
Do NOT block or obstruct the air flow over or around the ionizing tubes.
8.
Do NOT touch ionizing tubes when power is on.
9.
Do NOT operate outside of this range: -1°C to 49°C (30°F to 120°F).
10.
Tube cleaning should be performed only when the power is disconnected.
11.
The tubes require minimal cleaning with routine operation and maintenance. Longer operating cycles and reduced ionizing
efficiency may indicate the need for cleaning or replacing tubes by your AtmosAir dealer or qualified installer.
Commissioning Statement
Do not
commission new airhandlers after installation. All duct cleaning must be performed
before
the unit is installed.