Installation, Operation & Maintenance Guide
Matterhorn 1000/1002
9
1-888-MY-AIR11 CAG-06-21-003 AtmosAir.com
8.
Using the ‘T’ Clamp features in the Q.C.P, flatten the T
clamps first with your thumb and then flush with the Plier.
This feature is so the Q.C.P will not fall back through the
hole. Then tighten screws securely.
9.
Insert Tube(s) into the Matterhorn. Ensure that the Blue
angled bracket is
UNDER
the Q.C.P.
10.
Angle the Matterhorn into position with the
BLUE
tube
bracket toward the semi-circular cut out.
11.
Align Screws through the holes in Matterhorn and place
Matterhorn into position.
12.
Install wing nuts and snug down until gasket is
half compressed.
Electrical Installation
AtmosAir Matterhorn 1000/1002 series systems require
approximately 6 watts per tube. An internal 1.25-amp,
slow-blow fuse protects the unit.
■ Follow proper electrical procedures, guidelines, and codes for
providing power to the systems, including requirements for
conduit, sufficient ampacity, phase balancing, etc. Electrical
installation should be performed by a qualified electrician.
■ Field-install a power plug outlet or junction box within 8 feet
(2.5 m) of the unit(s).
■ Each Matterhorn 1000/1002 series unit is typically shipped
with a 10-foot power cord with a C-30 connector on one
end and a 3-prong NEMA 5-15 plug on the other end. The
plug can be cut off and wires stripped for junction box
installations.
Go to next step
NOTE: TUBE INSTALLATION NOT SHOWN IN THESE PICTURES.
Caution!
A non-functioning LED light may improperly indicate that the system
is not functioning. Be sure to disconnect from the main power before
performing maintenance or troubleshooting the system.
Dimensions on Next Page