background image

Installation, Operation & Maintenance Guide

 

Matterhorn 1000/1002 

9

1-888-MY-AIR11        CAG-06-21-003        AtmosAir.com

8. 

Using the ‘T’ Clamp features in the Q.C.P, flatten the T 
clamps first with your thumb and then flush with the Plier. 
This feature is so the Q.C.P will not fall back through the 
hole. Then tighten screws securely. 

9. 

Insert Tube(s) into the Matterhorn. Ensure that the Blue 
angled bracket is 

UNDER

 the Q.C.P.

10. 

Angle the Matterhorn into position with the 

BLUE

 tube 

bracket toward the semi-circular cut out.

11. 

Align Screws through the holes in Matterhorn and place 
Matterhorn into position.

12. 

Install wing nuts and snug down until gasket is  
half compressed.

Electrical Installation

AtmosAir Matterhorn 1000/1002 series systems require 
approximately 6 watts per tube. An internal 1.25-amp, 
slow-blow fuse protects the unit. 

 

■ Follow proper electrical procedures, guidelines, and codes for 

providing power to the systems, including requirements for 
conduit, sufficient ampacity, phase balancing, etc. Electrical 
installation should be performed by a qualified electrician. 

 

■ Field-install a power plug outlet or junction box within 8 feet 

(2.5 m) of the unit(s). 

 

■ Each Matterhorn 1000/1002 series unit is typically shipped 

with a 10-foot power cord with a C-30 connector on one 
end and a 3-prong NEMA 5-15 plug on the other end. The 
plug can be cut off and wires stripped for junction box 
installations. 

Go to next step

NOTE: TUBE INSTALLATION NOT SHOWN IN THESE PICTURES.

Caution!

A non-functioning LED light may improperly indicate that the system 
is not functioning. Be sure to disconnect from the main power before 
performing maintenance or troubleshooting the system.

Dimensions on Next Page

Summary of Contents for Matterhorn 1000 Series

Page 1: ...s pure natural state where no pollution or contaminants exist while reducing energy use and emissions in the process AtmosAir com CAG 08 21 004 IMPORTANT Save this Document for Future Reference Warran...

Page 2: ...ch installation or repair step exactly as shown and explained in this guide Observe all local state national and international electrical codes Pay close attention to all warnings and caution notices...

Page 3: ...r otherwise All persons having access to the serviced premises should comply with applicable public health laws and guidelines issued by federal state and local governments and health authorities such...

Page 4: ...tallation 6 Mechanical Installation Continued 7 Duct Cut Out and Quick Change Plate Procedure 8 Duct Cut Out and Quick Change Plate Procedure Continued 9 Electrical Installation 9 Installation Dimensi...

Page 5: ...d for minimal maintenance efforts The 1000 1002 series has two components that require inspection and maintenance 1 AtmosAir Matterhorn 1000 series base unit components 2 Ionization tubes Because ther...

Page 6: ...d tight utilizing the blue cap DO NOT TWIST THE TUBE OR MOVE THE EMITTER SCREEN DO NOT OVER TIGHTEN THE TUBE Once the tube is secure return the conductor strap to its normal position and ENSURE SOLID...

Page 7: ...8 Units should be installed to allow easy access for maintenance Install units so that the 5 step power adjustment knob and status light are easily accessible and visible 9 In the case of the M1000 t...

Page 8: ...learance is recommended Procedure 1 Always measure for clearances for the tubes and wires prior to any other steps Then place the Q C P in the appropriate area 2 Holding the Q C P in place use a marke...

Page 9: ...pproximately 6 watts per tube An internal 1 25 amp slow blow fuse protects the unit Follow proper electrical procedures guidelines and codes for providing power to the systems including requirements f...

Page 10: ...ion Operation Maintenance Guide Matterhorn 1000 1002 10 1 888 MY AIR11 CAG 06 21 003 AtmosAir com Contact Us 1 888 MY AIR11 1 888 692 4711 Matterhorn 880 882 Installation Operation and Maintenance Gui...

Page 11: ...ES TO AFS 262 AIRSWITCH SHEET 1 OF 1 UNLESS OTHERWISE SPECIFIED SCALE 1 3 REV B DWG NO A SIZE TITLE NAME DATE COMMENTS FIELD WIRING DIAGRAM FOR CONNECTING MATTERHORN TO AFS 262 AIR SWITCH TO LINE VOLT...

Page 12: ...act Recommended Maintenance Procedures Visually check the performance of the system by checking the green lights on the individual units If the lights are on then the unit should be functioning proper...

Page 13: ...er degeneration of the dielectric material that causes the dielectric to fail and arcing to occur Inspect the tube for black dots indicating failed dielectric 7 If physical inspection has not revealed...

Page 14: ...use a flathead screwdriver to pop the fuse drawer towards you Above Matterhorn 1000 Ionization unit Here you will see there is one Ionization Tube installed towards the center of the device This shoul...

Page 15: ...ean and pure quality air that is typically found at higher mountain elevations AtmosAir s unique and proven air purification process significantly reduces mold controls the spread of bacteria and airb...

Page 16: ...IGATIONS OF CLEAN AIR GROUP HERIN ARE EXPRESSLY GRANTED IN LIEU OF ALL WARRANTS WHETHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICUL...

Reviews:

Related manuals for Matterhorn 1000 Series