background image

Installation, Operation & Maintenance Guide

 

Matterhorn 1000/1002 

11

1-888-MY-AIR11        CAG-06-21-003        AtmosAir.com

03 

FIELD WIRING DIAGRAM

MATTERHORN

1000-1002

BLACK (HOT) WIRE TO N/O  

NORMALLY OPEN AND 

COM

WHITE (NEUTRAL)

AIRFLOW SAMPLING TUBE

INSERT 6" INTO AHU OR DUCT AFTER

FAN, AIRFLOW INTO TUBE END.

SILICONE IN PLACE

LEAVE OPEN TO 

AMBIENT AIR

LID IS REMOVABLE

1/4" POLYETHYLENE

TUBING

MOUNT ON DUCT OR AHU

HI

LO

WIRE NUTS

COMMON

NORM

OPEN

AFS 262 

WIRING

EXISTING COMPUTER PLUG

SUPPLIED WITH MATTERHORN

M1000/AFS262

DO NOT SCALE DRAWING

 FIELD

WIRING DIAGRAM

M-1000 SERIES TO AFS-262

AIRSWITCH

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 1:3

REV.

    B

DWG.  NO.

A

SIZE

TITLE:

NAME

DATE

COMMENTS: FIELD WIRING DIAGRAM 

FOR CONNECTING  MATTERHORN TO 

AFS-262 AIR SWITCH TO LINE VOLTAGE

Q.A.

Rev B                           SB            2-22-21

ENG APPR.                TA           2-21-19

2/21/19

DRAWN                     HRG       2-21-19

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER:

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL   .010

ANGULAR: MACH      BEND 

TWO PLACE DECIMAL     .010

THREE PLACE DECIMAL  

APPLICATION

USED ON

NEXT ASSY

PROPRIETARY AND CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF

ATMOSAIR SOLUTIONS.  ANY 

REPRODUCTION IN PART OR AS A WHOLE

WITHOUT THE WRITTEN PERMISSION OF

ATMOSAIR SOLUTIONS IS PROHIBITED.

5

4

3

2

1

ATMOSAIR SOLUTIONS

MATTERHORN 

100

SERIES TO

AFS-262 

CONNECTIONS

Summary of Contents for Matterhorn 1000 Series

Page 1: ...s pure natural state where no pollution or contaminants exist while reducing energy use and emissions in the process AtmosAir com CAG 08 21 004 IMPORTANT Save this Document for Future Reference Warran...

Page 2: ...ch installation or repair step exactly as shown and explained in this guide Observe all local state national and international electrical codes Pay close attention to all warnings and caution notices...

Page 3: ...r otherwise All persons having access to the serviced premises should comply with applicable public health laws and guidelines issued by federal state and local governments and health authorities such...

Page 4: ...tallation 6 Mechanical Installation Continued 7 Duct Cut Out and Quick Change Plate Procedure 8 Duct Cut Out and Quick Change Plate Procedure Continued 9 Electrical Installation 9 Installation Dimensi...

Page 5: ...d for minimal maintenance efforts The 1000 1002 series has two components that require inspection and maintenance 1 AtmosAir Matterhorn 1000 series base unit components 2 Ionization tubes Because ther...

Page 6: ...d tight utilizing the blue cap DO NOT TWIST THE TUBE OR MOVE THE EMITTER SCREEN DO NOT OVER TIGHTEN THE TUBE Once the tube is secure return the conductor strap to its normal position and ENSURE SOLID...

Page 7: ...8 Units should be installed to allow easy access for maintenance Install units so that the 5 step power adjustment knob and status light are easily accessible and visible 9 In the case of the M1000 t...

Page 8: ...learance is recommended Procedure 1 Always measure for clearances for the tubes and wires prior to any other steps Then place the Q C P in the appropriate area 2 Holding the Q C P in place use a marke...

Page 9: ...pproximately 6 watts per tube An internal 1 25 amp slow blow fuse protects the unit Follow proper electrical procedures guidelines and codes for providing power to the systems including requirements f...

Page 10: ...ion Operation Maintenance Guide Matterhorn 1000 1002 10 1 888 MY AIR11 CAG 06 21 003 AtmosAir com Contact Us 1 888 MY AIR11 1 888 692 4711 Matterhorn 880 882 Installation Operation and Maintenance Gui...

Page 11: ...ES TO AFS 262 AIRSWITCH SHEET 1 OF 1 UNLESS OTHERWISE SPECIFIED SCALE 1 3 REV B DWG NO A SIZE TITLE NAME DATE COMMENTS FIELD WIRING DIAGRAM FOR CONNECTING MATTERHORN TO AFS 262 AIR SWITCH TO LINE VOLT...

Page 12: ...act Recommended Maintenance Procedures Visually check the performance of the system by checking the green lights on the individual units If the lights are on then the unit should be functioning proper...

Page 13: ...er degeneration of the dielectric material that causes the dielectric to fail and arcing to occur Inspect the tube for black dots indicating failed dielectric 7 If physical inspection has not revealed...

Page 14: ...use a flathead screwdriver to pop the fuse drawer towards you Above Matterhorn 1000 Ionization unit Here you will see there is one Ionization Tube installed towards the center of the device This shoul...

Page 15: ...ean and pure quality air that is typically found at higher mountain elevations AtmosAir s unique and proven air purification process significantly reduces mold controls the spread of bacteria and airb...

Page 16: ...IGATIONS OF CLEAN AIR GROUP HERIN ARE EXPRESSLY GRANTED IN LIEU OF ALL WARRANTS WHETHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICUL...

Reviews:

Related manuals for Matterhorn 1000 Series