42
5.
Test with load
After finishing the above adjustments, test run the lift with a load. Run the lift in low
position for several times first, raising and lowering, make sure the lift can raise and
lower synchronously and the safety device can lock and release synchronously.
Then test run the lift to full rise. If there is anything improper, repeat the above
adjustment and re-test operation.
NOTE: Lift may vibrate when first used, after lifting it with a load several times
the air will bleed and the vibration should disappear automatically.
Hydraulic Schematic Diagram
Fig. 53
Summary of Contents for Atlas PV-10HPX
Page 1: ...1 Model PV10PX Revised 05 25 2021 ...
Page 10: ...10 D Install parts of extension columns See Fig 16 Fig 16 24 26 20 42 25 37 41 ...
Page 18: ...18 K Raise the carriages up by hand so they are locked at the same level See Fig 26 Fig 26 ...
Page 22: ...22 Install power unit See Fig 30 Fig 30 ...
Page 30: ...30 IV EXPLODED VIEW Model 211SAC Fig 43 ...
Page 38: ...38 4 5 POWER UNIT EXPLODED VIEW 220V 60Hz Single Phase Fig 48 ...